Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date30 Oct 2024
Closing Date7 Nov 2024
Tender Amount₹ 11,70,000
Costs
EMD
₹ 1,17,000Document Cost
₹ 766Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMBD_969965_15Bid Award Id
ViewTender No
2483/E-Tender/24-25 Dated 14-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Bricks (S.O.B) on edge pavement on patries laid and dry, joints filled with local sand including preparation of base to proper slope & its ramming. Spreading layer of 1 cm (3/8") depth of local sand over the sub-grade and including supply of all materials labour and T&P etc. required for proper completion of the work (S.I. No.-763) but including cost of polythene sheet including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
180
405
72900
... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M, and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M from the foundaiton trenches. (SI. No. 251) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
80
110
8800
... More
Concrete with 4cm Gauge stone ballast coarse sand of 1.25 F.M and cement in proportion of 8:4:1 in foundation and under floors (SI. No. 281) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
16
5500
88000
... More
R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. Binding wire of supplied by the contractor free of cost including making of drip coarse. (SI No. 283) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
37
7150
264550
... More
Mild steel or TMT Bars(Fe-500D grade or higher) or HYSD Bars or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel. (SI No. 504) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
14
7800
109200
... More
Maintenance of road for next five year after completion contractor shall be paid total maintenance cost 2.5% of Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including All Taxes but Excluding cost of GST.)
For 1st Year 0.00%
1080075
-
-
... More
Item No. 12 but for 2nd year 0.25%
1080075
-
2700.19
... More
Item No. 12 but for 3rd year 0.50%
1080075
-
5400.38
... More
Item No. 12 but for 4th year 0.75%
1080075
-
8100.56
... More
Item No. 12 but for 5th year 1.00%
1080075
-
10800.75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements