Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date7 Mar 2025
Closing Soon10 Mar 2025
Tender Amount₹ 5,15,00,000
Costs
EMD
₹ 10,30,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEUFZ_1000161_1Tender No
134/1KAM(BARA)E-Tendering/2025 date 07-01-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
1394
-
-
... More
Providing and applying primer coat with S.S.-1 Grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
9137
-
-
... More
Providing and laying dense graded bituminous macadam ( DBM -1) with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
822
-
-
... More
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. (Before BC)
9137
-
-
... More
Providing and laying bituminous concrete (BC- 2) with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG -40 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
274
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2000
-
-
... More
Sand filling in plinth including supply of necessary quantity of sand the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work.
170
-
-
... More
Providing and laying Cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone ballast 20 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. As per SOR No. 280 Sl. No. 5
228
-
-
... More
Providing and laying Reinforced cement concrete in M-25 grade concrete in foundation including formwork complete as per drawing and Technical specification and as per relevant clauses of section 1500, 1600, 1700 and clause 2704 of specification Sl no. 12.8 D Case I.
425
-
-
... More
Providing and laying Reinforced cement concrete in M-25 grade concrete in sub-structure including formwork complete as per drawing and Technical specification and as per relevant clauses of section 1500, 1600, 1700 and clause 2704 of specification Sl no. 12.8 D Case I.
450
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in foundation & sub-structure complete as per drawing and technical specifications as per MORT&H clause 1600 Sl. No. 12.4
550
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
630
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
385
-
-
... More
Supply & Laying of 1200 mm dia NP-4 reinforced cement conrete hume pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but etc. as per direction of E/I.
30
-
-
... More
Class 150 Brick work in 1:3 cement, coarse sand mortar in foundation & plinth complete item as per S.I.No. 307 in Head wall SOR No. 307(a)
90
-
-
... More
Providing and laying Cement concrete 1:2:4 (1 cement: 2coarse sand: 4 graded stone ballast 20 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. (SOR 279(a))
10
-
-
... More
12 mm thick plaster of 1:3 cement & coarse sand mortar complete item on no plate pillers on ends of Head walls/parapet including cost of all material, labour, T&P etc. (SOR 583)
90
-
-
... More
The maintenance of above road work including all civil work to the required standards and in the manner as defined in CB Condition and keep the entire road surface, road shoulders and all structures in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0% (Total Cost of Item nos. 1 to 57.5)
1
-
-
... More
The maintenance of above road work including all civil work to the required standards and in the manner as defined in CB Condition and keep the entire road surface, road shoulders and all structures in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ Charge - 0.25% (Total Cost of Item nos. 1 to 57.5)
1
-
-
... More
The maintenance of above road work including all civil work to the required standards and in the manner as defined in CB Condition and keep the entire road surface, road shoulders and all structures in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ Charge - 0.50% (Total Cost of Item nos. 1 to 57.5)
1
-
-
... More
The maintenance of above road work including all civil work to the required standards and in the manner as defined in CB Condition and keep the entire road surface, road shoulders and all structures in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ Charge - 0.75% (Total Cost of Item nos. 1 to 57.5)
1
-
-
... More
The maintenance of above road work including all civil work to the required standards and in the manner as defined in CB Condition and keep the entire road surface, road shoulders and all structures in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ Charge - 1% (Total Cost of Item nos. 1 to 57.5)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%