Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Eprocure
Opening Date23 Jun 2021
Closing Date29 Jun 2021
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CEUFZ_598306_1Bid Award Id
ViewTender No
223/1COM/2021-22 DATE 11.06.2021Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cartage of manhole cover from Prayagraj (Allahabad) ghat site to Katsari ghat (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work.
36
-
37
Cartage of chequerred plate from Prayagraj (Allahabad) ghat site to Katsari ghat (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work.
148
-
390
Cartage of iron anchor from Prayagraj (Allahabad) ghat site to Katsari ghat (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work.
9
-
118
Cartage of sal sliper from Prayagraj (Allahabad) ghat site to Katsari ghat(store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work.
420
-
240
Cartage of Sal edging from Prayagraj (Allahabad) ghat site to Katsari ghat(store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work.
47
-
127
Local shifting of Pantoon within 500m with the help of crain
18
-
1120
Dragging the Pantoon from dry bed to the river water and making pair and anchoring them in the down stream side of Pantoon bridge
9
-
2600
during carring the pantoon pair from place of anchoring (D/s side bridge) in water and to cross the dry bed/ shailow water on the way up to the aling ment disconnecting the pantoon pair and rolling the pantoon and fixing the alingment after
9
-
3500
Carrying of Pantoon pair from the place of anchoring (down stream side of bridge) to the alignment of bridge in water and fixing the same with other Pantoon pair and refixing the same in bridge alignment.
9
-
900
Sinking of Pantoons to obtain the proper gradient as laid in dry bed /shallow water in the alignment of Pantoon bridge as per direction of E/I
18
-
1020
Carriage and laying of spliced R.S. joist (5.25m long) including loading, unloading and cost of carriage from store to Katsari ghat ghat as per direction of E/I
95
-
55
Carriage,laying and relaying of chequared plate including loading, unloading and cost of carriage from store to Katsari store as per direction of E/I
148
-
55
Fixing of railing wire through hole of railing post and hole of vertical post and making wire stay of each rows and tightened with the help of stay clamps including making of hole in vertical ballies post (labour only)
510
-
0.8
cartege fixing of Railing post
57
-
40
Cartage of man hole cover and fitting on Pantoon
36
-
34
Two coat painting of railing post including paint and labour etc.
86
-
27
Carriage and laying of sal sleeper including loading, unloading and cost of carriage from store to Katsari store as per direction of E/I
420
-
28
Carriage and laying of sal edging including loading, unloading and cost of carriage from store to Dhuwaha ghat as per direction of E/I
47
-
14
carrying and spreading of kansa poola 5 cm thick carrige road way before filling of 7.50 cm thick kapsa soil including carrige of kapsa soil from distance of 1 km on the side of bridge spreading ramming and dressing the surface as per direction of E/I
85
-
10
Maintenance of Pantoon bridge
95
-
270
Maintenance of two row chequerred plate road
165
-
25
SUPPLY OF MATERIAL
Supply of Nylone rope of Garware brand of 28mm dia including cost of material cartage up to site and also including all taxes.
13
-
18500
Supply of ordinary Nylone rope of Garware brand of 32mm dia including cost of material cartage up to site and also including all taxes .
15
-
18500
Supply of plastic empty cement bags of good quality
12000
-
6
In empty cement bags of good condition (plastic) filed with local sand including filling stitching, stacking at site of work
12000
-
10
Supply of following materials including cartage and all local taxes etc complete. As per Allahabad schudule item No. 12,4,5,6,7,8,9 & 15
Narial Rope
4.5
-
2700
Calcutta Sutli
1.1
-
4250
begai badh
16
-
2350
M.S. Washer of 30 mm x 20 mm
0.5
-
7600
Nat Bolt 30 x 300 mm size
6
-
7850
Nat Bolt 30 x 150 mm size
2
-
7850
Nat Bolt 16 x 300 mm size
2
-
7850
Supply of U-clamp with nut cartage & all local taxes included
260
-
27
Mallahi Nail of 15 cm to 30 cm long
4
-
5700
Supply of eucliptus balli 150 mm dia
550
-
78
Supply of eucliptus balli 100 mm dia
2900
-
30
Supply of eucliptus balli 120 mm dia
550
-
45
Supply and fixing of wooden crate (With sand filled bag) of wooden crate of equiliptus ballies 2.80 x 1.80 x 1.80 m size made of 8 cum ballie including cost of labour, T & P and
36
-
2350
Supply of 12mm dia wire rope including cartage and all local
taxes etc. complete
510
-
83
Supply of 20mm dia wire rope including cartage and all local taxes etc. complete
400
-
305
Supply of large bamboo of 7.50 cm dia including cartage and all
local taxes etc. complete
600
-
12
Supply of large bamboo of 5.00 cm dia including cartage and all
local taxes etc. complete
230
-
6
Supply of railing wire clamp including cartage and all local
taxes etc. complete
18
-
575
Supply of wire nail including cartage and all local taxes etc. complete
3
-
5600
Supply of sign board of size 4' x 3' including cartage and all local taxes etc. complete
2
-
6100
Lettering and painting of sign board of size 4' x 3'
2
-
715
Making bariar on both side of Pantoon bridge with ballies
(labour only)
2
-
430
Bundaling with the help of 10cm horizontal ballies and 15cm vertical ballies @ 50cm C/C ballies and fixing below 1.00 to 3.00 m of water level and placing sand filled bag up to 30cm above
40
-
170
S/L wooden anchor of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails & Weaving Packing avarage 90 Sand Filled cement bag & also Including anchoring with PP rope (1.5 inch dia) all matrial labour T&P etc. required for (u/s)
18
-
3200
S/L wooden anchor of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails & Weaving Packing avarage 90 Sand Filled cement bag & also Including anchoring with Coir rope (1.5 inch dia) all matrial labour T&P etc. required for(D/S)
18
-
4600
supply and Clamping of chequred with U-clamps
148
-
30
Cartage of wooden anchor from store to bridge head including loading, unloading and cost of carriage from store and placing
on the as per direction of E/I
36
-
355
Making stay on both side of Pantoon bridge with the help of 20mm /10mm wire rope (labour only)
36
-
355
Hire charges of boat with mallah with large boat
150
-
580
Watch and ward of materials at Katsari ghat (Chaukaidar)
1095
-
225
Earth work in embankment by carted earth (Loam,Clay or sand) excavation to be in the form of pit not exceeding 50 cm in depth and earth work in embankment to be in 20 cm layers, including the ramming & dressing the surface to required levels and slops and also including 1.50 meter lift and 30meter lead. the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as direction by the E/I
In Katsari side and Utari Barua ghat Side
1400
-
94
Supply and laying of local sand including cost of material,
loading, unloading and its cartage up to site of work
60
-
500
Fixing of Khunta etc.
360
-
470
G.S.T. Shall be Paid extra as per Prevailing rules
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements