Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Eprocure
Opening Date8 Nov 2024
Closing Date13 Nov 2024
Tender Amount₹ 57,00,000
Costs
EMD
₹ 4,85,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMBD_971641_3Tender No
6082/E-Nivida-MBD Circle/24-25 DT 22-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density with bitumenus emulssion SS. 3.5% and OPC Cement @1% by wet of mix.and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
470
7900
3713000
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.25 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen etc. complete as per diretcion by i-in-c but excluding G.S.T.
4687.5
13
60937.5
Providing, laying and rolling of open-graded premix carpet (HMP) of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 Grade Bitumen bitumen to required line, grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Type B seal coat as per technical Specification Clause 508 and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen etc. complete as per diretcion by i-in-c but excluding G.S.T. Tecnical Specification clause 508
4687.5
176
825000
Providing and laying seal coat by mechanical means (HMP) with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 and including all material, labour, labour cess, T&P royalty, all tasex, Bitumen etc. complete as per diretcion by i-in-c but excluding G.S.T.
4687.5
56
262500
Mantinance Part A @ 7.50 %
-
-
-
Maintenance of constructed Bituminous road next five year after completion the contractor shall be paid total maintenance cost 7.5% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST)
For 1st Year 0.00%
5168437.5
-
-
Item No. 9 but for 2nd year 0.75%
5168437.5
-
38763.28
Item No. 9 but for 3rd year 1.50%
5168437.5
-
77526.56
Item No. 9 but for 4th year 2.25%
5168437.5
-
116289.84
Item No. 9 but for 5th year 3.00%
5168437.5
-
155053.13