If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 71,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.30 kg per sqm on the granular surface cleaned with mechanical broom as per technical specification clause 503 including cost of bitumen.

6750

14

97875

... More
Providing, laying and rolling of open-graded Premix Carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen (VG-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in Hot mix plant, laying and finishing with paver finisher and compaction with three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal Coat 'Type-C' as per MORD Technical Specification Clause 508 including cost of bitumen. Case-II By Mechanical Means (HMP 30/40) (I) Bitumen VG-10

6750

162

1093500

... More
Providing and laying Seal Coat sealing the voids in a bituminous (VG-10) surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 including cost of bitumen. Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10.

6750

52

351000

... More
Construction of subgrade and Earthern shoulders with approved material obtained from borrow pits with a lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Tables 300-2 with a lead upto 1000 m as per Technical specification clause 303.1.

1020

75

76500

... More
Maintenance of bituminous surface road including filling potholes and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024 & Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 2nd year @ 0.75% cost of work of Total work of amount 1 to 7)

1

-

-

... More
Maintenance of bituminous surface road including filling potholes and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024 & Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 3rd year @ 1.50% cost of work of Total work of amount 1 to 7)

1

29910

29910.94

... More
Maintenance of bituminous surface road including filling potholes and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024 & Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 4th year @ 2.25% cost of work of Total work of amount 1 to 7)

1

59821

59821.88

... More
Maintenance of bituminous surface road including filling potholes and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024 & Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 5th year @ 3.00% cost of work of Total work of amount 1 to 7)

1

89732

89732.81

... More
Maintenance cost for 5th year @ 3.00% cost of work of Total work of amount 1 to 7

1

119643

119643.75

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405.

60

3600

216000

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501

180

7700

1386000

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

220

20

4400

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.( P.C.C grade M 10 (i) Nominal mix 1:3:6)

45

5920

266400

... More
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 II. (Brick masonry in 1:4 cement mortar)

110

6710

738100

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

480

210

100800

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20

25

6850

171250

... More
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification 1000

6

8000

48000

... More
Maintenance of Concrete surface including Crack Sealing spot patching including restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culverts and cause ways,maintennance of guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 (Maintenance cost for 1st year @ 0.00% cost of work of Total work of amount 13 to 20)

1

-

-

... More
Maintenance of Concrete surface including Crack Sealing spot patching including restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culverts and cause ways,maintennance of guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 (Maintenance cost for 2nd year @ 0.25% cost of work of Total work of amount 13 to 20)

1

7327

7327.38

... More
Maintenance of Concrete surface including Crack Sealing spot patching including restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culverts and cause ways,maintennance of guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 (Maintenance cost for 3rd year @ 0.50% cost of work of Total work of amount 13 to 20)

1

14654

14654.75

... More
Maintenance of Concrete surface including Crack Sealing spot patching including restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culverts and cause ways,maintennance of guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 (Maintenance cost for 4th year @ 0.75% cost of work of Total work of amount 13 to 20)

1

21982

21982.13

... More
Maintenance of Concrete surface including Crack Sealing spot patching including restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culverts and cause ways,maintennance of guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 (Maintenance cost for 5th year @ 1.00% cost of work of Total work of amount 13 to 20)

1

29309

29309.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.