Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 Dec 2024
Closing Soon1 Jan 2025
Tender Amount₹ 2,20,25,446.67 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 13,01,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRT_986972_1Tender No
8969 /96M/E-TENDER/BSR CIRCLE/2024-25 Dated 16-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
3950
890
3515500
... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move). (as per SOR Sl No.- 251a) Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
750
110
82500
... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per SOR Sl. No.-275)
28
4300
120400
... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work (As per SOR Sl. No.-279)
69
6870
474030
... More
Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hooks and authorised overlapping shall be measurised as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
8590
78
670020
... More
First class Brick Work in 1:3 cement & coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work. (As per SOR Sl. No.-307
22
5410
119020
... More
Cement Concrete with 2 cm. gauge stone grit instead of 4 cm. gauge stone ballast, coarse sand & cement in the proportion of 3:1½:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per SOR Sl.No- 279b)
2.4
7500
18000
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surfaces cleaned with Hydraulic broom as per Technical Specification Clause 503.
18235
15
273525
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
18235
180
3282300
... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
18235
69
1258215
... More
Construction of embankment (For Patri) with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
4740
125
592500
... More
(C.C. Work) 05 years Maintenance Charge @ 2.5%
Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. First year Maintenance Charge @ 0.00%
15422366.5
-
-
... More
Second year Maintenance Charge @ 0.25 %
15422366.5
-
38555.92
... More
Third year Maintenance Charge @ 0.50%
15422366.5
-
77111.83
... More
Fouth year Maintenance Charge @ 0.75%
15422366.5
-
115667.75
... More
Fifth year Maintenance Charge @ 1.00%
15422366.5
-
154223.67
... More
(Bitiminous Work) 05 years Maintenance Charge @15%
Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T.
Frist year Maintenance Charge @ 0.00%
5406540
-
-
... More
Second year Maintenance Charge @ 1.50 %
5406540
-
81098.1
... More
Third year Maintenance Charge @ 3.00%
5406540
-
162196.2
... More
Fourth year Maintenance Charge @ 4.50%
5406540
-
243294.3
... More
Fifth year Maintenance Charge @ 6.00%
5406540
-
324392.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%