Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Nov 2024
Closing Soon21 Nov 2024
Tender Amount₹ 55,10,000
Costs
EMD
₹ 4,76,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_970906_16Tender No
SE Ref No 4127/183 com-Va.Vritt/24-25 Dt 16.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm -11.2 mm aggregates using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant,laying and rolling with three wheel static roller 80-100 KN capacity ,finished to required level and grades to be follwed by seal coat of Type -C as per Technical Specification Clause 508.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3900
168
655200
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3900
61
239850
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
460
61
28290
PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024. Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 01 to 06)
1
-
-
1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
-
-
2nd year- maintainance cost 1.5% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
17222
17222.85
3rd year- maintainance cost 3 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
34445
34445.7
4th year- maintainance cost 4.50% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
51668
51668.55
5th year- maintainance cost 6 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
68891
68891.4
Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(45.0-63mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-2 as per Technical Specification clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
63
2350
148050
Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
105
2550
267750
Construction of un reinforced plain cement concrete pavement, thickness as per design over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M30(Grade) coarse and fine aggregates confoming to IS:383 maximum size of coarse aggreagate not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design laid in approved fixed side formwork (steel channel laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the formwork as per drawing) spreading the concrete with shovels rakes compacted using needle screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints and near aapproaches and construction joints admixtures as approved curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. & also including all taxes. Labour cess but excluding GST)
315
7700
2425500
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers,trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
140
19
2772
Plain Cement Concrete (PCC) M-10(1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802. & also including all taxes. Labour cess but excluding GST)
57.8
5200
300560
Brick Masonry Work in Cement Mortar 1:4 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
79
5850
462150
Plain Cement Concrete (PCC) M-20(1:2:4 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802.I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
28
6750
189000
Providing and laying Reinforced Cement Concrete in sub structure as per drawing and techanical specification clauses 800 (Excluding cost of Reinforcement)R.C.C. (m-25)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
16
7380
118080
Supplying fitting and placing TMT bar reinforcement in superstructure complete as per drawing and specification Clausees 1002,1010 & 1202. As per SOR SI No-504(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
8
6350
50800
12mm thick plaster with cement mortar consisting of 1 part cement and 3 part of approved coarse sand. Minimum thickness not be less than 10 mm required for proper completion of the work.AS PER SI NO. 583(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
280
165
46200
PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024. Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 7to 16)
1
-
-
1st year- maintainance cost 0% CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
-
-
2nd year- maintainance cost 0.25 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
10027
10027.16
3rd year- maintainance cost 0.5 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
20054
20054.31
4th year- maintainance cost 0.75 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
30081
30081.47
5th year- maintainance cost 1 % CC & Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1
40108
40108.62
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%