Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date12 Feb 2025
Closing Date17 Feb 2025
Tender Amount₹ 88,96,000
Costs
EMD
₹ 6,45,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMRZ_1004751_14Bid Award Id
ViewTender No
574/53M-MZP Circle/2025 Date-03.02.2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing ,laying,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness ,hand packing, rolling with smooth wheel roller 80-100KN in stages to proper grade and camber ,applying and brooming, stone screening , binding material to fill up the interstices of course aggregate, watering and compacting to the required density grading 3 as per PWD specification.
275.63
3625
999158.75
... More
Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base spraying primer @0.70kg / sqm using mechanical means as per Technical Specification Clause 502.
3675
45
165375
... More
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with mechanical broom as per Technical Specification Clause 503.
3675
20
73500
... More
Providing, laying and rolling of open - graded premix carpet of 20 mm thickness composed of 13.2 mm (sieve passing 22.4 mm & retaining 11.2mm) & 11.2 mm grit (sieve passing 13.2 mm & retaining 5.60mm) aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508.
3675
177
650475
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat.
3675
67
246225
... More
Earth work in patari in ordinary soil etc including dressing every additional 1.50m lift or part of 1.50m as per S.I. No. 253.
1158
80
92640
... More
Earth work in excavation for structures as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
376
110
41360
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanical mixed ,placed in foundation and completed by vibration inluding curing for 14 days.
52.4
5890
308636
... More
Plain cement concrete 1:2:4 nominal mix in foundation with crushed stone aggregate 20 mm nominal size mechanical mixed ,placed in foundation and completed by vibration inluding curing.
15.87
6880
109185.6
... More
Reinforcement cement concrete (M-25) in Super structure complete as per drawing and technical specification as per MORD Data Book.
17.7
6900
122130
... More
Mild Steel or iron in plain work such as in reinforced concrete including bending for proper completion of the work and including supply of steel its wastage etc.
16.2
6570
106434
... More
S/O 600 mm 7.50 R/M including supply of all material ,labour, T&P etc complete as per direction of Eng-in-charge.
7.5
1875
14062.5
... More
P/L ,Fixing, Jointing 900 mm H.P with Coller SI No. 30 (NS 5)(III)
2
450
900
... More
Stone masonary work in cement mortar 1:4 in foundation compacted as per drawings and technical specifications .
242
5400
1306800
... More
Stone masonary work in cement mortar 1:4 in Sub structure compacted as per drawings and technical specifications .
154
5580
859320
... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification clause 613.3 and 1204.
224
69
15456
... More
Filter Media behind retaining wall as per specifications 1204.3.8 in a width of 600mm.
82
3050
250100
... More
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes & other sccessories at site including cost of POL NS page -57
180
110
19800
... More
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
0.98
-
-
... More
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (1.00%)
0.98
84327
82640.46
... More
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.50%)
0.98
126490
123960.2
... More
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.00%)
0.98
168653
165279.94
... More
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3.00%)
0.98
252980
247920.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements