... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date20 Mar 2025
Closing Date26 Mar 2025
Tender Amount₹ 1,95,00,000
Costs
EMD
₹ 11,75,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEALG_1019781_3Bid Award Id
ViewTender No
1283/Cashier(PDH)-AC/2024-25 Dt. 19-02-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing & applying Tack Coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.30Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Machanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work, as per MORD specification No. 503 (Excluding Cost of GST)
8980
18
161640
... More
Providing, laying & rolling of open graded Premix Carpet of 20mm thickness composed of 13.2mm to 5.60mm aggregates including mixing in a suitalbe plant, laying & rolling iwth a three wheeled 80-100KN static roller capacity, finished to required level & grades bitumen @ 14.6Kg./10Sqm. area for premixing including all material, Labour and T&P etc required for proper completion of the work, as per MORD Specification No. 508(Excluding Cost of GST)
8980
183
1643340
... More
Providing and laying seal coat type "C" scaling the voids in a bituminous surfsce PC. surface laid to specified levels grade and cross fall using with 67 mm nominal size grit of Approved quarry @0.09 cum per 10sqm with Bitumen @ 6.50 kg/10sqm including heating of Bitumen to the required temperature and including all material, Labour & T&P ete as per Clouse 510 of MORD Specification.(Excluding Cost of GST)
8800
68
598400
... More
Supply and Fixing of Km. Stone, HectoMeter Stone and Sign Board etc. complete as per requirment of Site as per direction of E/I (Excluding Cost of GST)
1
30000
30000
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. For Building/ Drain work only. As Per SOR 4.1.1(Excluding Cost of GST)
46
150
6900
... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. In Foundation and floors. As Per SOR 275(a) (Excluding Cost of GST)
9
5900
53100
... More
Providing and laying of 40 mm gauge B/B under Hume pipe culvert foundation in road work including all materials, labours, T&P etc. required for completion of the work. As Per SOR 20-18(Excluding Cost of GST)
27
1650
44550
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation-150 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) As Per SOR 6.1.1 (Excluding Cost of GST)
37
5500
203500
... More
Supply and Laying of of 350 mm dia NP-3 Hume Pipe including 15%Transportation Charges includin all materials, Labour, T&P etc. complete as per requirements of Site. As Per Direction of E/I. foundation below HP Level (For 350mm) (Excluding Cost of GST)
52.5
1835
96337.5
... More
Supply and Laying of of 600 mm dia NP-3 Hume Pipe including 15%Transportation Charges includin all materials, Labour, T&P etc. complete as per requirements of Site. As Per Direction of E/I. foundation below HP Level (For 600mm) (Excluding Cost of GST)
22.5
2987
67207.5
... More
Ruled Pointing on brick work with cement mortar of mix 1:3 (1Cement : 3 Fine Sand) SOR SI No. 574A (Excluding Cost of GST)
90
135
12150
... More
12 mm cement plaster on brick work with cement mortar of mix (upto 10 mtr height from Ground level) 1:4 (1 cement : 4 Coarse sand) As Per SOR 13.4.1(Excluding Cost of GST)
8
200
1600
... More
White washing with lime on undecorated wall surfaces (Two coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters. As Per SOR 672 (Excluding Cost of GST)
90
13
1170
... More
PART-B C.C. Work
Construction of Subgrade and earthen shoulders of embankment with approved material obtained from borrow pits with a lift upto 1.5m transporting to site, spreading, grading to required slope and compacting to meet requirement of as per Technical specification clause 303.1(Excluding Cost of GST)
2800
140
392000
... More
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i)For Grading I Material
260
3250
845000
... More
Providing, laying, spreading and compacting machine crushed stone ballast of approved quarry of 53-22 4mm size to water bound macadam of G-3 specification including spreading in uniform thickness, hand packing rolling with power roller 8 to 10 tonnes in stages to proper grade and camber applying and brooming with crushable screening material Le stone dust to fill-up the interstices of coarse aggregate, watering & rolling making necessary earthen bund to protect edges, lighting, guarding, barricadding etc. including the cost of all materials, labour, T & P etc. required for proper completion of work was per MORD specifications no 405. (Excluding Cost of GST)
180
3870
696600
... More
CEMENT CONCRETE PAVEMENT (CC ROAD) Construction of un-reinforcement plain cement concrete pavement thickness as per design, over a parepared sab base with 43 grade coment or any other type as per clause 1501 1.2M 30(grade) coarse and fine ggregate conforming to IS 383 maximum size of coarse aggregate not exceeding 25mm mised in a concrete mixer of not less then 0.2 Cum capacity and appropriate weight batcher Josing approved mix design, laid in approved fixed side from work (Steel channel laying and faxing of 125 micron thick plastic sheet, wedges steel plates including levelling the form unk as per drawing) spreading the concrete with shovels, rakes compacted using needle arved and plate vibrators and finished in continuous operation including provision of traction and expansation construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (Where pecified) and water finishing to lines and grade as per drawing and technical specification approved Quarry grit Clause 1501. (Excluding Cost of GST)
365
7700
2810500
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. For Building/ Drain work only. (Excluding Cost of GST)
450
150
67500
... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Fine sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. In Foundation and floors. (Excluding Cost of GST)
90
5600
504000
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation-100 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (Excluding Cost of GST)
170
5500
935000
... More
12 mm cement plaster on brick work with cement mortar of mix (upto 10 mtr height from Ground level) 1:4 (1 cement : 4 Coarse sand)(Excluding Cost of GST)
780
190
148200
... More
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 Coarse sand : 4 graded stone aggregate 20 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. All work upto plinth level (Excluding Cost of GST)
34
6900
234600
... More
Part-A (Bituminous Work) 05 Year Maintenance Charge @ 7.50%)
Routine Maitenance of road for 05 Years after the completion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)
1-1st Year @ Nill
1
-
-
... More
2nd Year @ 0.25%
1
28064
28064.11
... More
3rd Year @ 0.50%
1
56128
56128.23
... More
4th Year @ 0.75%
1
84192
84192.34
... More
5th Year @ 1.00%
1
112256
112256.45
... More
Part-B (C.C. Work) 05 Year Maintenance Charge @ 2.50%)
Routine Maitenance of road for 05 Years after the completion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)
1-1st Year @ Nill
1
-
-
... More
2nd Year @ 0.25%
1
16583
16583.5
... More
3rd Year @ 0.50%
1
33167
33167
... More
4th Year @ 0.75%
1
49750
49750.5
... More
5th Year @ 1.00%
1
66334
66334