Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Eprocure
Opening Date17 Oct 2021
Closing Date4 Oct 2021
Tender Amount₹ 8,00,00,000
Costs
EMD
Refer DocumentsDocument Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CEMBD_620530_1Bid Award Id
ViewTender No
3889/E-Nivida-MBD Circle/21-22 DT 04-09-2021Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, and including, labour, T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete as per clause 401.
3400
-
3500
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam G-3 specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density and including, labour, T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T.
380
-
4100
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density and including, labour, T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T.
1230
-
3700
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density with bitumenus emulssion SS. 3.5% and OPC Cement @1% by wet of mix and including, labour, T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T.
3700
-
7000
... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom and including, labour, T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T.
38700
-
13
... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause and including, labour, T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. No. 509 complete in all respects
1550
-
10300
... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.50:3 in cc pavement (theckness as per design) cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture /Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour , tools & plants etc. required for proper completion of work and also including complete shifting of Recron 3S fibre reinforcement material etcl & concrete etc. and including, labour, T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. SI No- New Item 3 Chep 20 and excluding G.S.T.
670
-
7000
... More
Excavation in foundation in ordinary soil (loan, clay or sand) including lift up to 1.5 m and lead up to 30m and including filling waterning and ramming of excavated earth in to the trenches or in to the space in to the building and the side of foundation tranches.3 and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects
81
-
110
... More
Plain cement concrete with 4cm guage stone ballast and fine sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation and under floors and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects SI No- 281
82
-
5500
... More
Laying and compacting dry O.B.B. 40mm. Gauge in foundation in layers of not more than 15cm. Thickness including local sand, in ratio 2:1 and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects SI No New item 1 Chp 5
10
-
1100
... More
M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects . (SI No - 307a)
50
-
4800
... More
Struck pointing with cement mortar consisting of 1 part cement and 2 part of the fine sand of 1.25 finenes modulus on brick work and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects Si No 574
93
-
165
... More
Concrete with 2 cm guage stone grit instead 4cm guage stone ballastof fine sand of 1.25 F.M and cement in proportion of 1:2:4 in foundation and under floors and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects . (SI No- 279 A)
0.42
-
6300
... More
R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and including, all material labour, labour cess T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. complete in all respects Binding wire of supplied by the contractor free of cost. SI No- 283 and excluding G.S.T.
166
-
7100
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and including, labour, T&P all taxes ect. complete as per direction by i-in-c but excluding G.S.T. SI No 504 and excluding G.S.T.
65
-
6100