Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Re-construction Of Damage Rcc Culvert Of Balia Khurd Link Road In Km-1 in Chandauli, Uttar Pradesh. The bid opening date for this tender is 15-05-2021 and the last date for bid submission is 21-05-2021. Interested bidders for Public Works Department tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Costs
EMD
Refer DocumentsDocument Cost
₹ 856Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CEUVZ_586261_1Bid Award Id
ViewTender No
648/4A Dt- 10.05.2021Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
R.C.R. Stone masonry work in 1:4 cement and course sand mortar in foundation including supply of material, labour and T&P for proper completion of the Stone Khanda complete as per drawing and technical specifications 702, 704, 1202, 1204 &MORD no.700/12.4 (Including all taxes, labour cess but Excluding GST)
82.73
-
3990
... More
Providing and laying 600 mm dia N.P.-3 Hume Pipe Medium duty conform to IS 458 : 2003 including collars/Spigot Jointed with stiff mixture of cement in the proportion of 1:2 (1 Cement : 2 Fine Sand) including Testing of Joints, all taxes transportation charges & contractor,s profit etc. complete (Including all taxes, labour cess but Excluding GST)
7.5
-
3200
... More
Construction of embankment with approved material obtained from borrow pits with all lift and lead upto 1 km transporting to site sperading grading to required slope and compacting to meet requirment of 95% proctor density as per sor no 254b including royalty. (Excluding GST)
103.13
-
134
... More
Laying C.C. Road slab consisting of 1:1.5:3 cement, course sand and 20mm guage stone ballast over prepared sub grade after its rectifications & bringing it to proper camber and including supply of all materials, labour and T&P etc. required for proper completion of the work, finished to required template as directed by Engineer-in-charge but excluding cost of metal required for rectification of the sub-grade.As per SOR S.I. No.773B/16&P-35 (Including all taxes, labour cess but Excluding GST)
1.66
-
7100
... More
Mild steel or iron in plain work such as in reinforced concrete.. As SI no. 4/504&P-30 (Including all taxes, labour cess but Excluding GST)
8.48
-
6350
... More
P/F PVC pipe 75mm dia in weep hole. (Including all taxes, labour cess but Excluding GST)
22.5
-
108
... More
Stuck cement ponting with 1:2 cement and sand of 1.25 fineness modulus mortar with coloring material to match the masonry work including all materials, labour,T&P etc.As per Technical Specification Clause 1/574/ P-34 (Including all taxes, labour cess but Excluding GST)
68.3
-
185
... More
Earth work in excavation in foundation of structure as per drawing and technical specification including seeting out, construction of shoring and bracing removal stumps and other deleterous matter, dressing of sides and bottom black filling the excavation earth to the extent require and utlising the remaining earth locally for road work. (Including all taxes, labour cess but Excluding GST)GST)
40.8
-
128
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including all taxes, labour cess but Excluding GST)
28.3
-
4280
... More
R.C.C. work with cement approved course sand and 2cm guage approved stone ballast in the proportion of 1:1.5:3 in RCC slab, excluding its fixing and binding the same with 24B.W.G.G.I binding wire and including necessary centering & shuttering etc. and also including S/o all materials required for proper completion of the work. Binding wire to be supplied by the contractor free of cost.as per S.I. no.11/284b&P-23 (Including all taxes, labour cess but Excluding GST)
7.2
-
6870
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements