Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date10 Feb 2025
Closing Date15 Feb 2025
Tender Amount₹ 55,45,000
Costs
EMD
₹ 4,77,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEALD_1004207_42Bid Award Id
ViewTender No
229/10 COMM A PRJ CIRCLE/2025 Dt 10-01-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Grading-3 specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density complete in all respect as per MORD Technical Specification Clause 405 & as per direction of Engineer-in-charge.
182.81
2669
487919.89
... More
Construction of unreinforced, plain cement Concreet Pavment, thikcness 15cm, overa prepared sub base, with43 grade cemment or any other typeas per M30 coarse and fine aggregates conforming to IS:383, the maximum size of coarse aggregates not exceeding 25mm, ixed in a concrete mixer of not less than 0..2cum capacity and appropriate weigh batcher using approved mixed design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 mmicron thick polythene film, wedges, steel platesincluding levelling the formwork as pper drawing),,spreading the concrete with shovels, raes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joint, curing of concrete slab for 14 days using curing comppound(where specified) and water finishing lines and grade as per drawings complete in all respects as per Technical Specification Clause 1501 & as per direction of Engineer-in-charge
365.63
7444
2721749.72
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work complete in all respect as per MORD Technical Specification Clause 305 & as per direction of Engineer-in-charge.
299.51
60
17970.6
... More
Providing & laying plain cement concrete 1:3:6 in open foundations as per drawings complete in all respects as per MORD technical specification Clauses 800 /1200 & as per direction of Engineer-in-charge.
43.54
5418
235899.72
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M20, RCC 1:1½:3)
94.86
7429
704714.94
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
5956.89
70
416982.3
... More
Supply & laying of 350 mm dia NP-3 HP Culvert complete in all respect as per MORD Technical Specification Clause 1101 & as per direction of Engineer-in-charge.
15
1190
17850
... More
The Maintenance Cost will be provided for five years @7.50 percent.
(The Maintenance Cost will be calculated as per actual executed construction cost at the time of final bill)
1
-
-
... More
1st Year Maintenance Charges @ 0.00 % of BOQ Cost
1
-
-
... More
2nd Year Maintenance Charges @ 0.25 % of BOQ Cost
1
13479
13479
... More
3rd Year Maintenance Charges @ 0.50 % of BOQ Cost
1
26958
26958
... More
4th Year Maintenance Charges @ 0.75 % of BOQ Cost
1
40437
40437
... More
5th Year Maintenance Charges @ 1.00 % of BOQ Cost
1
53916
53916