Public Works Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date14 Feb 2025
Closing Date25 Feb 2025
Tender Amount₹ 46,59,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CEMENT TREATED SUBBASE Providing, laying and spreading, Material on a prepared sub grade (GSB) adding cement @ 2% by weight to tbe spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base.

197

3995

787015

... More
CEMENT TREATED BASE WBM Grade-III Providing, laying and spreading Material on a prepared sub base, adding cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the Road roller at OMC to achieve the desired unconifined compressive strength and to form a layer of base.

300

4717

1415100

... More
Providing and applying tack coat with Bitumen (VG-10) at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer complete as per Technical Specification Clause 503.(Including cost of Bitumen)

3375

15

50625

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508.(Including cost of Bitumen)

3375

200

675000

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510. (Including cost of Bitumen)

3375

71

239625

... More
Earth work in patries with ordinary soil (loam,clay and sand) excavation to be in the form of regular pits not exceeding 50 cm in depth and earth work in embankment to be in 20 cm layers including the ramming and dressing the surface to required levels, slopes and also including 1.5 m lift and 30 m lead the earth form cutting to be used in making embankment or to be deposited as spoil bank within 30 m distance as directed by the Engineer-In-Charge including mechanically compaction without royalty as per ( S.I. No. 253) in

650

105

68250

... More
NP3 Hume Pipe Culvert 600 mm Dia- 2 No. Earth work in excavation in foundation as per S.I. No. 251

23.35

120

2802

... More
Concrete with 40 mm gauge brick ballast, fine sand of 1.25 F.M. and cement in the proportion of 6:3:1 as per S.I. No. 280

3.88

6550

25414

... More
Supply of 600 mm dia Hume Pipe NP-3 type

7.5

2665

19987.5

... More
Laying of R.C.C. Hume pipe in construction of culvert.

3

425

1275

... More
Class 150 A brick work in 1:3 cement and fine sand mortar As per S.I.No. 306

2.61

5150

13441.5

... More
Class 150 A brick work in 1:3 cement and coarse sand in super structure As per S.I.No. 307

1.26

5440

6854.4

... More
Struck pointing with 1:2 cement and fine sand. As per SI. NO. 574

16.49

190

3133.1

... More
Earth work in ordinary soil. As per SI. No. 253

46.25

105

4856.25

... More
Cost of IInd Year Maintenance @ 0.75%

1

33204

33204

... More
Cost of IIIrd Year Maintenance @1.50%

1

66409

66409

... More
Cost of IVthYear Maintenance @2.25%

1

99613

99613

... More
Cost of Vth Year Maintenance @3.00%

1

132818

132818



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.