Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date11 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 2,31,13,000
Costs
EMD
₹ 13,56,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_973641_1Tender No
1763/30C-Hamirpur Circle/2024 Date 20.09.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means
168
3000
504000
... More
Providing, Laying and spreading material on a prepared sub grade, adding OP cement @ 2% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base. CTSB
1185
2850
3377250
... More
Providing, Laying and spreading material on a prepared sub grade, adding OP cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base. CTB
1575
3400
5355000
... More
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503.
11250
17
191250
... More
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Technical sepecification Claues 508
11250
155
1743750
... More
Providing and laying seal coat by manual means with VG-10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C As per Technical Specification Clause 510
11250
56
630000
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,
337.5
7000
2362500
... More
Patri
Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread asoil in place with rotavator with 2 pslaked lime having minimum 70 per cent of contents of CaO, grading with motor grader and compacting with the smooth wheel road roller at OMC toer centthe desired density to form a layer of improved Sub-grade as per Technical Specification Cluase 403. (A) By Manual Means
3880
310
1202800
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. S.I.No-253(a)
166
120
19920
... More
Fine Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km. (5 miles) from the side of work & including watering,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. S.I.No-255
16
1000
16000
... More
Bedding for Pipe Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)
7
1500
10500
... More
Cement concrete with 4cm gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
20
4300
86000
... More
Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. S.I.No-305
120
5300
636000
... More
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 finerness modulus. S.I.No-574
77
120
9240
... More
Providing and laying of hume pipe NH-3 for culverts with filing of joints in cement and sand mortar in 1:2 including labour, T&P etc required for proper completion of work as per of Engineer-in-Charge.1000 mm dia
45
5900
265500
... More
Supply & Laying cement concrete pipe NP-3 350 mm dia (burried Conduits) on first calss bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation protection works, backfilling. concrete and masonary work in head wall and parapoets as per MORD specification no. 1100 sr no. 9.7 as per Data book item no. 9.70
60
1200
72000
... More
Cement concrete with 20mm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. As per S.I. 279(a).
0.16
5600
896
... More
12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus. As per SI. No.-584
87
135
11745
... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 1st year (@ 0 % of total work amount )
1
-
-
... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 2nd year (@ 0.75 % of PC Portion work amount)
1
132271
132271.13
... More
Maintenance Charge including @ Earth work , repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 3rd year (@ 1.5% of PC Portion work amount)
1
264542
264542.27
... More
Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 4th year(@ 2.25 % of PC Portion work amount)
1
396813
396813.4
... More
Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 5th year (@ 3.0% of PC Portion work amount)
1
529084
529084.53
... More
Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 1st year (@ 0.0 % of CC Portion work amount )
1
-
-
... More
Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for Zero to 2nd year (@ 0.25 % of CC Portion work amount )
1
8732
8732.75
... More
Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for Zero to 3rd year (@ 0.5 % of CC Portion work amount )
1
17465
17465.5
... More
Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 4th year (@ 0.75 % of CC Portion work amount )
1
26198
26198.25
... More
Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 5th year (@ 1.0 % of CC Portion work amount )
1
34931
34931
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%