Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Nov 2024
Closing Soon22 Nov 2024
Tender Amount₹ 4,60,00,000
Costs
EMD
₹ 9,20,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_971270_1Tender No
2755/ 1com. su.a cir / 2024 Dated 16.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of granular sub-base by providing coarse graded material, from approved query spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete as per Clause 401.
1929.53
-
-
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying of 1% OPC cement and 3.5% emulsion in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
2707.82
-
-
Providing and applying Tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.25 kg. Per Sqm. On the prepared bitumesious/granular surface.
16259.64
-
-
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
487.9
-
-
Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2. in patri
4300
-
-
Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.50 in & lead upto 30 m Including filling watering & ramming of excavated earth into the trenches or upto the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trenches. S.I. 251 (For Drain)
317.2
-
-
Cement concrete with 2 cm gauge stone gritt. Approved coarse sand and cement in the proportion of 6:3:1 insluding supply of all materials labour and T&P etc. required for poper completion of the work. S.I. 280 (For Drain)
48.75
-
-
R.C.C. work with cement approved coarse sand and 2cm (3/4'') gauge approved srone ballast in the proportion 1:2:4 (1Cement: 6 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending but including its fixing and binding the same necessary with 24BWG binding wire and including necessary centering and shuttering etc. and also including supply of materials labour and tools and plants etc. required for proper completion of the work, strength of the concrete shall not be less than M-150 S.I. No.-281. . S.I. 283 (For Drain)
100.1
-
-
Supplying, fitting and placing HYSD bar reinforcement in Foundation, sub-structure & SuperStructure complete as per drawing and Technical Specifications.SI.No.504
63.05
-
-
Excavation in foundations in ordinary soil including lift up to 1.50M and lead upto 30M as directed by Engineer in Charge. SI.No.251
253.92
-
-
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (SOR 280)
43.5
-
-
Class-150 brick work in 1:3 Cement and fine sand of 1.25 fineness modulous mortar infoundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.SI. No.303
256.26
-
-
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
60
-
-
Provdiing and laying Plain/Reinforced cement concrete M-25 in Super structure including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with (SOR 284B)
23.88
-
-
Wearing coat (SOR 279b)
4.32
-
-
Mild steel or iron in plain work such as in reinforced concrete / brick work (when not included in overall rates) wrought to required shape as necessary I/C bending for proper completion of the work and including supply of steel, it's wastage and hooks and authorized over lapping shall be measured. (SOR 504)
28.12
-
-
Stuck pointing with cement and fine sand of 1.25 fineness modulus morter on stone work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (SI No.574)
73.32
-
-
Filling brickbats as filler material between roadcrust and abutment (SOR Material 2 (C))
50.4
-
-
Excavation in foundation in ordinary soil.
30.96
-
-
Plain cement concretewith 4 cm gauge stone ballast ,coarse sand and cement 1:3:6 in foundation as per SI no 280
2.7
-
-
Brick masonry work M-150 in 1:4 cement and fine sand of 1.25 FM in foundation and plinth inc all complete As per SI No-305
11.43
-
-
Supply of 1000 mm dia NP3 Hume pipe including cartage complete.
10
-
-
Laying of 1000 mm dia NP3 Hume pipe in proper position complete
4
-
-
Pointing with cement mortar (1:3) As Per SI No-574
29.26
-
-
Excavation in foundations in ordinary soil including lift up to 1.50M and lead upto 30M as directed by Engineer in Charge. SI.No.251
93.75
-
-
Providing and laying in Cement concrete 1:3:6 of not less than strength of M150stone ballast(40 mm nominal size) 2 apprroved coarsesand :1 Cement and curing complete,including cost of form work in foundation and floors S.L. 280
14.06
-
-
Class-150 brick work in 1:3 Cement and fine sand of 1.25 fineness modulous mortar infoundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.SI. No.307
106.63
-
-
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
72
-
-
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications
22.29
-
-
Supplying, fitting and placing HYSD bar reinforcement in Foundation, sub-structure & SuperStructure complete as per drawing and Technical Specifications.SI.No.504
15.34
-
-
Pointing on brick work on edge with cement mortar 1:2 (1cement :2 Sand)SI.No.574
97.11
-
-
Back filling behind abutment with granular material
21
-
-
Maintenance Cost @ 2.50% As per Go No. 17/2024/Sa-113/23-23-1-2024-23-1099/113/2023 Dt 16.01.2024 and 3689C/PRML/Mul-23-24 Dt 17.02.2024
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%