Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date12 Sep 2024
Closing DateCancelled
Tender Amount₹ 64,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing laying and spreading Material on a prepared sub-base, cement @ 4% by weight to the spread Material manually. Mixing in place with rotavator and compaction with the road roller at OMC to achieve the desired unconfined compressive strengthe and to form a layer of base. (CTB)

295

1371750

4650

... More
Providing and applying tack coat with bitumen VG-10 at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.

3937.5

55125

14

... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades to be followed by a seal coat of either Type c as per technical Specication clause 508

3937.5

708750

180

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510

3937.5

240187

61

... More
Providing and laying Cement concrete 1:4:8 (1 cement : 4 fine sand : 8 graded brick Ballast 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. S.i. No. 275

3.39

14746

4350

... More
Providing and laying reinforced cement conrete pipe (350mm HP) NP3 for culverts o first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets Clause 1106.

22.5

38250

1700

... More
Providing & fixing of sign Board etc. complete

1

5000

5000

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0.00% (Total Cost of Item nos. 1 to 10)

1

-

-

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ 0.75% (Total Cost of Item nos. 1 to 10)

1

39237

39237.07

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ 1.50% (Total Cost of Item nos. 1 to 10)

1

156948

156948.27

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ 2.25% (Total Cost of Item nos. 1 to 10)

1

117711

117711.2

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ 3.00% (Total Cost of Item nos. 1 to 10)

1

156948

156948.27



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.