Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Eprocure
Opening Date5 Nov 2024
Closing Soon19 Nov 2024
Tender Amount₹ 15,43,000
Costs
EMD
₹ 1,54,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEALD_970196_7Tender No
2165/19A/2024-25 Date 25-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.GST will be paid extra as per prevelling rules.
2100
12
26250
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 80-100 KN capacity, finished to required level and grades to followed by seal coat.GST will be paid extra as per prevelling rules.
2100
175
367500
Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .GST will be paid extra as per prevelling rules.
2100
60
126000
CC Work
-
-
-
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
90
7860
707400
Maintenance Charges 5 Years from the Actual completion of Work for PC
-
-
-
Maintenance cost of Ist year
1
-
-
Maintenance cost of 2nd year @ 1.50 % cost of Work
1
10403
10403.25
Maintenance cost of 3rd year @ 3.00 % cost of Work
1
20806
20806.5
Maintenance cost of 4th year @ 4.50 % cost of Work
1
31209
31209.75
Maintenance cost of 5th year @ 6.00 % cost of Work
1
41613
41613
Maintenance Charges 5 Years from the Actual completion of Work for CC
-
-
-
Maintenance cost of Ist year
1
-
-
Maintenance cost of 2nd year @ 0.25 % cost of Work
1
1768
1768.5
Maintenance cost of 3rd year @ 0.50 % cost of Work
1
3537
3537
Maintenance cost of 4th year @ 0.75 % cost of Work
1
5305
5305.5
Maintenance cost of 5th year @ 1.00 % cost of Work
1
7074
7074
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%