Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date22 Mar 2025
Closing Date27 Mar 2025
Tender Amount₹ 1,45,40,000
Costs
EMD
₹ 9,27,000Document Cost
₹ 2,715Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEUCZ_1020663_1Tender No
574MT/1MT-Etender-UC/2024 Dt. 29-01-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of sub-base.(Including labour Cess & Excluding GST)
545
3880
2114600
... More
Providing, laying and spreading material on prepared sub-base, cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of base.(Including labour Cess & Excluding GST)
731
4320
3157920
... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(Including labour Cess & Excluding GST)
1615
96
155040
... More
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30-0.40 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.(Including labour Cess & Excluding GST)
8025
14
112350
... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Case - I By Manual Means (I) Bitumen (S-90) (Including labour Cess & Excluding GST)
8025
182
1460550
... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 A. By Manual Means Case - III : Type C (I) Bitumen (S-90) (Including labour Cess & Excluding GST)
8025
65
521625
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 (Including labour Cess & Excluding GST)
6.3
6720
42336
... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 I In 1:3 cement mortar (Including labour Cess & Excluding GST)
60.8
6790
412832
... More
Plastering with cement mortar (1:3), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 (Including labour Cess & Excluding GST)
6.8
218
1482.4
... More
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 (Including labour Cess & Excluding GST)
146
74
10804
... More
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets - 350 mm dia hume pipe (Including labour Cess & Excluding GST)
45
1750
78750
... More
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets - 1000 mm dia hume pipe (Including labour Cess & Excluding GST)
60
6500
390000
... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Including labour Cess & Excluding GST)
1333
160
213280
... More
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.
9
6700
60300
... More
Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 (Including labour Cess & Excluding GST)
48
900
43200
... More
Providing and laying reinforced cement concrete M 30 grade in superstructure as per drawing and technical specifications (Including labour Cess & Excluding GST)
133
9750
1296750
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (Including labour Cess & Excluding GST)
14.5
78100
1132450
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (Including labour Cess & Excluding GST)
21
170
3570
... More
Drainage spouts complete as per drawing and technical specifications Clause 1209 (Including labour Cess & Excluding GST)
6
550
3300
... More
Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and vertical movement of 3 mm. as per drawing and technical specifications Clause 2600 (Including labour Cess & Excluding GST)
17
3050
51850
... More
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall.(Including labour Cess & Excluding GST)
32
3300
105600
... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification (Including labour Cess & Excluding GST)
12
3710
44520
... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (Including labour Cess & Excluding GST)
24
3250
78000
... More
Maintenance of constructed road for next five year after the actual date of completion. The Contractor shall be paid total maintenance cost @ 7.5% on Construction cost. (Including labour Cess & Excluding GST)
(i) 2nd Year Maintenece @ 0.75%
2.14
48587
103978.23
... More
(ii) 3rd year Maintenece 1.5%
2.14
97175
207956.47
... More
(iii) 4th year Maintenece 2.25%
2.14
145763
311934.7
... More
(iv) 5th year Maintenece 3%
2.14
194351
415912.94
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements