Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Eprocure
Opening Date5 Jun 2021
Closing Date25 Jun 2021
Tender Amount₹ 1,59,00,000
Costs
EMD
Refer DocumentsDocument Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CEMBD_591717_4Bid Award Id
ViewTender No
1933/E-Nivida-MBD Circle/21-22 DT 10-05-2021Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T.
632
-
4300
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T.
675
-
4250
... More
Brick edging on both side of the road of first class (M-150) brick on edge laied with mud mortar including labour and supply of bricks finished to the recuired templete and in proper alignment and also including dressing and ramming the exavated earth and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T.
2.25
-
59500
... More
Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 .and including all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. (Bitumen/Emulson issued departmently as per schedule ''C'' including loading unloading and cartage up to site)
8437.5
-
25
... More
Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with Hydraulic burmer incliding as per Tecnical Specification clause 503. and including all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. (Bitumen issued departmently as per schedule ''C'' including loading unloading and cartage up to site)
8437.5
-
12
... More
P/L of open graded premix carpeting of 20mm thick composed with 13.2 mm to 5.60mm grit aggregate or approved graded grit @ 0.27 cum/10Sqm. using bitumen (VG-10) @ 146.00 Kg./100Sqm. as bearing course, including heating of bitumen to required temperature, and including all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. (Bitumen issued departmently as per schedule ''C'' including loading unloading and cartage up to site)
8437.5
-
172
... More
Providing and applying seal coat type ‘C’ with 2.36 mm gauge stone grit @ 0.90 cum/100 Sqm & bitumen (VG-10) 65 kg/100 Sqm including heating of bitumen to required temperature, mixing of stone grit with suitable mixol, laying and rolling with a smooth wheeled roller and including all material, labour, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. (Bitumen issued departmently as per schedule ''C'' including loading unloading and cartage up to site)
8437.5
-
62
... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.50:3 in cc pavement (theckness as per design) cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture /Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour , tools & plants etc. required for proper completion of work and also including Recron 3S fibre reinforcement material etcl & concrete etc. and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. Chp 20 New Item 3
84.38
-
7000
... More
Excavation in foundation in ordinary soil (loan, clay or sand) including lift up to 1.5 m and lead up to 30m and including filling waterning and ramming of excavated earth in to the trenches or in to the space in to the building and the side of foundation tranches.3 and incliding supply of all meterial T&P and etc. as per direction of Engineer in charge. and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T.
100
-
110
... More
Concrete with 4cm. Gauge brick ballast fine sand of 1.25 F:M. and cement in proportion of 12:6:1 in foundation and under floors required for proper completion of work. SI No- 273 and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T.
4
-
2950
... More
Laying and compacting dry O.B.B. 40mm. Gauge in foundation in layers of not more than 15cm. Thickness including local sand, in ratio 2:1 and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T.
6
-
1100
... More
Laying & fixing NP-3, 350mm dia hume pipe and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T.
22.5
-
1100
... More
Laying & fixing NP-3, 600mm dia hume pipe and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T.
15
-
2200
... More
M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. (SI No - 307-309)
30
-
4800
... More
Struck pointing with cement mortar consisting of 1 part cement and 2 part of the fine sand of 1.25 finenes modulus on brick work and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. Si No 574
60
-
165
... More
Concrete with 2 cm guage stone grit instead 4cm guage stone ballastof fine sand of 1.25 F.M and cement in proportion of 1:2:4 in foundation and under floors and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. (SI No- 279 A)
0.35
-
6300
... More
Plain cement concrete with 4cm guage stone ballast and fine sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation and under floors and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. SI No- 281
10
-
5500
... More
R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. SI No- 283
24
-
7100
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including all labour, material, labour cess, T&P royalty, all tasex ect. complete as per direction by i-in-c but excluding G.S.T. SI No 504
15
-
6100
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements