Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date4 Nov 2024
Closing Date12 Nov 2024
Tender Amount₹ 91,01,000
Costs
EMD
₹ 6,56,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEALG_970639_1Bid Award Id
ViewTender No
5054- Cashier(P.D.A)-24-25 Dt-19-10-24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying of premix sand seal coat (Type-B) with HMP of appropriate capacity not less than 200 tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade. as per clause 511 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. (Including cost of Bitumen)
10780
53
571340
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Local earth), as per clause 305 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
1090
110
119900
Part-B (CC Work)
Providing, laying, spreading and compacting stone aggregates of specific sizes (53 mm to 22.4 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. as per clause 404 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
49.5
4460
220770
Surface Dressing of the Ground including removing vegetation and in-equalities not exceeding 15cm deep and disposal of rubbish, lead up to 50m and lift up to 1.5 mtr. All Kind Soil. (As Per PWD SOR Page No. 26 Sr. No. 9 DSR SP NO. 2.28.1) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
3300
12
39600
Providing and laying Cement Concrete in 1:2:4 (1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 20 mm nominal Size) Including Supply of all Material , labour and T & P Etc. Required for Proper Completion of the Work. (As Per PWD SOR Sl. No. 5 PWD Sl No. 279 Page No. 28) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
165
6900
1138500
Construction of un-reinforced, plain cement concrete pavement over a prepared sub base with approve grade (M-40) cement @ 430 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing. & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
330
9200
3036000
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications (dowel bar & tie rod) As per clause 1600 & 2200 & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
45.5
8200
373100
Excavating, Supplying and Filling of Local earth by mechanical transport upto a lead upto 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (As Per PWD SOR Page No. 26 Sr. No. 8 DSR SP NO. 2.25(a)) & including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
384
285
109440
Part-A (Bituminous Work) 05 Year Maintenance Charge @ 15%)
Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)
1-1st Year @ Nill
1
-
-
2nd Year @ 1.50%
1
45959
45959
3rd Year @ 3.00%
1
91917
91917
4th Year @ 4.50%
1
137876
137876
5th Year @ 6.00%
1
183834
183834
Part-B (CC Work) 05 Year Maintenance Charge @ 2.50%
Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)
1-1st Year @ Nill
1
-
-
2nd Year @ 0.25%
1
12294
12294
3rd Year @ 0.50%
1
24587
24587
4th Year @ 0.75%
1
36881
36881
5th Year @ 1.00%
1
49174
49174