Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date13 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 3,29,32,000
Costs
EMD
₹ 18,47,000Document Cost
₹ 2,715Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEKNP_992995_1Tender No
6145/55C-EV/2024 DATE 06-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including All Taxes but Excluding G.S.T.)
4100
190
779000
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Including All Taxes but Excluding G.S.T.)
1090
3200
3488000
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including All Taxes but Excluding G.S.T.)
535
3500
1872500
... More
Providing laying and spreading Material on a prepared sub base, cement @1.0% and 3.5% bitumen emulsion by weight to the spread Material manually mixing in place with rotavetor and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. (Including All Taxes but Excluding G.S.T.)
1750
7700
13475000
... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including All Taxes but Excluding G.S.T.)
14600
11
160600
... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including All Taxes but Excluding G.S.T.)
585
12100
7078500
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including All Taxes but Excluding G.S.T.)
400
70
28000
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including All Taxes but Excluding G.S.T.)
73
5850
427050
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (without steel) (Including All Taxes but Excluding G.S.T.)
105
8750
918750
... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. (Including All Taxes but Excluding G.S.T.)
95
7150
679250
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. (Including All Taxes but Excluding G.S.T.)
24
245
5880
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications (Including All Taxes but Excluding G.S.T.)
68
7550
513400
... More
Pointing with cement mortar (1:2 ) on brick work in substructure as per Technical Specifications (Including All Taxes but Excluding G.S.T.)
55
75
4125
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (Including All Taxes but Excluding G.S.T.)
10
3000
30000
... More
Laying of 600mm Hume Pipe Culvert (Single Row) (Including All Taxes but Excluding G.S.T.)
30
3300
99000
... More
Laying of 350mm Hume Pipe Culvert (Single Row) (Including All Taxes but Excluding G.S.T.)
30
1950
58500
... More
Maintainance Charge including @ Earth work, Repair of painted surface, Earth work on patri, Culvert, Road Furniture etc as per Direction E/I for the period of Five Year from the actual completion of work. as per Direction of E/I for the period of Five Year from the actual completion of work (Excluding G.S.T.) (I) Maintenance of First Year (@0% of Total Work Amount of 1 to 19)
1
-
-
... More
Maintainance Charge including @ Earth work, Repair of painted surface, Earth work on patri, Culvert, Road Furniture etc as per Direction E/I for the period of Five Year from the actual completion of work. as per Direction of E/I for the period of Five Year from the actual completion of work (Excluding G.S.T.)
(II) Maintenance of Second Year (@0.25% of Total Work Amount of 1 to 19)
1
78386
78387
... More
Maintainance Charge including @ Earth work, Repair of painted surface, Earth work on patri, Culvert, Road Furniture etc as per Direction E/I for the period of Five Year from the actual completion of work. as per Direction of E/I for the period of Five Year from the actual completion of work (Excluding G.S.T.) (III) Maintenance of Third Year (@0.50% of Total Work Amount of 1 to 19)
1
156773
156773
... More
Maintainance Charge including @ Earth work, Repair of painted surface, Earth work on patri, Culvert, Road Furniture etc as per Direction E/I for the period of Five Year from the actual completion of work. as per Direction of E/I for the period of Five Year from the actual completion of work (Excluding G.S.T.) (IV) Maintenance of Fourth Year (@0.75% of Total Work Amount of 1 to 19)
1
235159
235160
... More
Maintainance Charge including @ Earth work, Repair of painted surface, Earth work on patri, Culvert, Road Furniture etc as per Direction E/I for the period of Five Year from the actual completion of work. as per Direction of E/I for the period of Five Year from the actual completion of work (Excluding G.S.T.) (IV) Maintenance of Fifth Year (@1.00% of Total Work Amount of 1 to 19)
1
313546
313546
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%