Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date25 Oct 2024
Closing Date3 Dec 2024
Tender Amount₹ 23,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(45.0-63mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-2 as per Technical Specification clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST). (Including all taxes, Labour Cess but excluding GST )

157

2830

444310

... More
Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also (Including all taxes, Labour Cess but excluding GST )

146

3000

438000

... More
Brick edging on both side of road with first class brick 8 cm. (3”) wide 12 cm. (4.50”) deep laid with mud mortar including all materials, labour, T & P etc. complete.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. (Including all taxes, Labour Cess but excluding GST )

0.65

78000

50700

... More
Providing and applying primer coat with bitumen emulsion (SS-II) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means as per Technical Specification Clause 502.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. (Including all taxes, Labour Cess but excluding GST )

1950

35

68250

... More
Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Air compresser as per Technical Specification Clause 503.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes (Including all taxes, Labour Cess but excluding GST )

1950

15

29250

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm -11.2 mm aggregates using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant,laying and rolling with three wheel static roller 80-100 KN capacity ,finished to required level and grades to be follwed by seal coat of Type -C as per Technical Specification Clause 508.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes.. (Including all taxes, Labour Cess but excluding GST )

1950

175

341250

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. (Including all taxes, Labour Cess but excluding GST )

1950

62

120900

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers,trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes (Including all taxes, Labour Cess but excluding GST )

41.1

19

813.78

... More
Cement concrete with 4 cm gauge brick ballast coarse sand and cement in the proportion 8:4:1 including cost of all material, labour etc. complete. SI No-275 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. (Including all taxes, Labour Cess but excluding GST )

6.3

4400

27720

... More
Brick Masonry Work in Cement Mortar 1:4 in Foundation with coarse sand complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. 1300 SI. No. 305b (Including all taxes, Labour Cess but excluding GST )

20.9

5500

114950

... More
Pointing with cement mortar (1:2 ) on brick work in super structure as per Technical Specifications SI No. 574 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. (Including all taxes, Labour Cess but excluding GST )

42

185

7770

... More
Providing and laying 350 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. but excluding cost of collor (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. (Including all taxes, Labour Cess but excluding GST )

22.5

1600

36000

... More
Providing and laying 600 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. but excluding cost of collor (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. (Including all taxes, Labour Cess but excluding GST )

7.5

3200

24000

... More
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.

1

-

-

... More
1st year - maintainance cost 0% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

-

-

... More
2nd year - maintainance cost 0.75% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

15155

15155.01

... More
3rd year - maintainance cost 1.5% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

30310

30310.02

... More
4th year - maintainance cost 2.25% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

45465

45465.03

... More
5th year - maintainance cost 3% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

60620

60620.03



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.