Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date23 Aug 2024
Closing Date10 Sep 2024
Tender Amount₹ 16,80,771 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Pontoon Bridge On River Ganga From Mirzapur To Betawar Varanasi In District Mirzapur

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sal edging (3.65x0.17x0.1)

346

14

4844

... More
Sal Sleeper (4.25x0.25x0.125)

1680

27

45360

... More
R.S. Joist of 5.25 Metr

576

55

31680

... More
R.S. Joist of 10.00 Meter

16

55

880

... More
Extraction of 10mm dia wire roap wira from ralling post and making roll

200

-

170

... More
Deferent material such as nut and bolts, washer, wire, roap, P.P. Roap etc.

7

690

4830

... More
Cariadge of pantoon after dismantling from bridge site to store place including haulage of the pantoon upto river bank, disconnecting the pantoon loading, unloading with the help of crane labour T&P etc.

80

990

79200

... More
Supply of Narial roap 37 mm dia of approved quality including cost of material and cartage at site with all taxes labour and T&P etc complete.

2

2685

5370

... More
Supply of plastic roap of approved quality including cost of material and cartage at site with local taxes, labour and T&P etc complete.

1

17500

17500

... More
Supply of wooden crate of size (2.80x1.8x1.8m) including cost of material and cartage at site with local taxes labour and T&P etc complete

90

2280

205200

... More
Supply of wooden anchor of size (2.50x1.80x3.10m) with 10 & 15 cm Eqiliptous balli including cost of anchor

400

1650

660000

... More
Erruction of Pantoon Bridge and its approach and cartage of the material from stote including, loading and unloading at bridge site. Cartage of pantoon from store to bridge site including loading on truck trailer and unloading on sited.

80

3325

266000

... More
Local Shifting of pantoon within 500 mater with the help of crain

80

1100

88000

... More
Dragging the pantoon from dry bed to the river water and making pair and anchring them in the down stream side of pantoon bridge.

40

2540

101600

... More
Carying of pantoon pair from the piace of anchoring (down streem side of bridge) to the alignment of bridge in water and fixing the same with other pantoon pair and refixing the same in bridge alignment.

40

990

39600

... More
Sinking of pantoons to obtain the proper gradient as laid in dry bad/shallow water in the alignment of pantoon brodge as per directiono E/I

2

1015

2030

... More
Laying wooden anchors in the river on the up stream/Down stream side of the pantoon bridge site including their weaving packing the sand filled bags (av 90 bags) properly before laying and fixing to pantoon with coir rope/shall rope excluding cost.

290

685

198650

... More
Carriage and laying of spliced R.S. Joist (10.00 m long) including loading unloading cost of carriage from central store and placing on the as per direction of engineer including.

20

76

1520

... More
Carriage and laying of spliced R.S. Joist (5.25 m long) including loading unloading cost of carriage from central store and placing on the as per direction of engineer including.

545

57

31065

... More
Cariage of wooden anchor from stone to bridge head including loading unloading cartage etc as per direction of Engineer in charge

150

346

51900

... More
Cartage of the following material from store to bridge site including loading and unloading and staching etc complete. Ralling post

1200

33

39600

... More
Sal edging (3.65x0.17x0.1)

346

14

4844

... More
Sal Sleeper (4.25x0.25x0.125)

1680

29

48720

... More
Extraction of 10mm dia wire roap wira from ralling post and making roll

1020

85

86700

... More
Deferent material such as nut and bolts, washer, wire, roap, P.P. Roap etc.

5

690

3450

... More
Cartage and laying of chaquired plate including loading unloading cost of carriage from store to laying at site and also relaying of chaquerred plate after making camber by speading of local sand as per derection E/I

636

80

50880

... More
Supply and filling of E.C. Bags with the local sand and stiching with the sutal placing filling bags in position at both side pantoon bridge.

2000

6

13000

... More
Supply and filling of E.C. Bags with the local sand and stiching with the sutal and placing filled bags in position in pile culvert.

2000

6

13000

... More
Painting and wamishing on iron work in small area with two coat paint including cost of all material labour and T&P

904

29

26216

... More
Latering on sign board with paint complete

550

7

3850

... More
Maintanacnce of Pantoon Bridge day and night thought 7 months including all labour etc complate all as directied by E/I (Rate =1 mate + 2 beldar and one small boat with mallah +2 hours of pumping set for dewatering the water from pantoon = (1x350+2x350+1+585+2x150)x30}

3

55080

165240

... More
Maintanance of Chequirred plates road thought 7 months including all labour etc complete all as directied by E/I (Rate is for Mela Period i.c. 3 month = Si. No. 19 (vi) = 18000/3*7= Rs 42000/for 7 months

0.5

42000

21000

... More
Providing and Erection of Phoos huts for maintenance of Pantoon Bridge (12x10) Feets.

4

7000

28000

... More
Supply of following material errection of pantoon Missing Nut, Bolt MS washer, U clamp etc

4

7524

30096

... More
Lardge Bamboos of 7.5 cm dia

2.4

12

28.8

... More
Small Bamboos of 5 cm dia

2.8

6

18.2

... More
Calcutta sutall

1

4075

4075

... More
Begal Badh

1

2280

2280

... More
Malshi Nail of 15 cm to 30 cm long

1.6

5380

8608

... More
Supply of wooden creats of equiliptus ballies 2.80x1.80x1.80 m size made of 8 cm ballie including cost of labour T&P and material

3.6

2280

8208

... More
Making bariar on bothe site of pantoon bridge with ballies

0.8

415

332

... More
Supply of stell ralling wire 10 mm dia

400

80

32000

... More
Bundaling with the help of 10 cm horizontal ballies and 15 cm vertical ballies @ 50 cm C/C ballies and fixing below 1.00 to 3.00 M of water level and plancing sand filling bag upto 30 cm above

8

175

1400

... More
Supply of wooden ballies 150 mm dia Each 4 M in length

60

76

4560



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.