Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date30 Jan 2023
Closing DateCancelled
Tender Amount₹ 11,29,000
Costs
EMD
₹ 1,13,000Document Cost
₹ 944Tender Fee
Refer Documents
Summary
Construction Of Primary School Kromottar Antu(ps) In Block Sadawa Chandrika , Pratapgarh
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CEALD_770224_5Bid Award Id
ViewTender No
13/26M/E-Tendering/2023 Dated 02.01.2023Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
RCC work with cement approved coarse sand and 2cm gauge approved stone grit in propotion of 1:1.5:3 in lintels of door and window excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGGI Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work including cost of binding wire. As per schedule Item No. 284 (cloumn, DPC, Sill Band, Lintel Band, Jamb of door and window, Lintel, Roof, loft, sun shade, Beam) & attached drawing
20.25
-
8191.85
... More
M.S. (tor steel or plain) in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. As per schedule Item No. 504 & attached drawings (cloumn, DPC, Sill Band, Lintel Band, Jamb of door and window, Lintel, Roof, loft, sun shade, Beam, Angle Iron, Gril, Iron Door, window) .
1762.8
-
48.93
... More
M.S. or iron work in angle iron door and window frame including cutting, welding and wastage including supply of all materials, labour, T&P etc. required for proper completion of the work. As per schedule Item No. 503 (A) (Iron door, window, chaukhat, Gril) & attached drawing
406.37
-
65.55
... More
Providing and fixing of 18 gauge MS sheet along with angle iron and door & window. as per attached drawings.
657.9
-
65.55
... More
First class/class-150 brick work in 1: 4 cement and coarse sand in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. As per schedule Item No. 303 & attached drawing
26.93
-
6193.05
... More
First class/class-150 brick work in 1: 6 cement and coarse sand in foundation and plinth including supply ofall materials, labour and T&P etc. required for proper completion of the work. As per schedule Item No. 303
33.35
-
6909.35
... More
First class/class-150 brick work in 1: 4 cement and coarse sand in foundation and plinth including supply ofall materials, labour and T&P etc. required for proper completion of the work. As per schedule Item No. 305 (wall)
0.77
-
7095.55
... More
Filling/ banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden of steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m : (Excavated earth)
22.43
-
95
... More
Filling/ banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden of steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m : (Cartage earth)
10.76
-
95
... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. as per attached drawings.
3.7
-
617.5
... More
Concrete with 4 cm gauge stone brick ballast coarse sand of and cement in proportion of 1:6:12 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. As per schedule Item No. 273 & attached drawings (floor,apren)
8.27
-
4325.35
... More
2.5 cm (1") thick 1:2:4 plain cement concrete floor with cement, approved coarse sand and 2 cm (1") graded approved stone, grit,laid in panels finished with 3 mm (1/8") floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified over and including 8 cm (3") thick base concrete consisting of cement, fine sand of 1.25 fineness modulus and brick ballst 4 cm (1½")gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish, including supply of all materials, labour and Tools & Plants etc required for proper completion of the work. As per schedule Item No. 60 & attached drawings (floor, Apren)
110.3
-
304.95
... More
Providing and fixing glass strips of 3.15 mm (1/8") thickness in joints of floors and skirtings at the time of laying floors flush with floor level including all materials labour, Tools & Plants etc. complete. As per schedule Item No. 631 & attached drawings (floor,apren)
196
-
5.7
... More
12 mm thick cement plaster with cement, & fine sand in proportion of 1:4 complete. As per schedule Item No. 586 and attched drawings.
323.88
-
176.7
... More
6 mm thick cement plaster with cement, white lime, & fine sand in proportion of 1:3 complete. as per attached drawings
119.74
-
255.55
... More
Providing and fixing of green board and skirting work. as per attached drawings
16.5
-
376.2
... More
Supply & fixing of R.C.C. Gril work (Jali) of approved pattern & make at site of work in cement concrete consisting of cement, approved coarse sand and 6 mm nominal size stone grit in the proportion of 1:2:4 and reinforced with 6 mm dia M.S. wire/bar/including cutting & fine sand of 1.25 fineness modulus mortar including supply of all materials labour, tools & plantset. required for the proper completion of the work but excluding plaster on janbs, sill and soffit of the opening. As per schedule Item No. 18.07 and attached drawings.
8
-
57
... More
White washing one coat including supply of all materials, labour and T&P etc. required for proper completion of the work. As per schedule Item No. 642
434.54
-
9.42
... More
Painting or varnishing new work in small areas or new wood work with one coat (upto one sq. mt.) of ready mixed priming paint and two coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour and tools and plants etc. required for proper completion of the work. Paint to be used should confirm the I.S.I. No. 103-1950. As per schedule Item No. 641 and attached drawings.
38.7
-
72.2
... More
Making drip course in sun shades or facia as per direction of E/I. including supply of all materils, labour T&P etc. for proper completion of the work. As per attached drawings
59.62
-
11.4
... More
Providing of Ramp work With Hand Rail. As per Direction of Engineer in-charge and attched drawings
5.4
-
3277.5
... More
Providing of internal electrical work. As per direction of Engineer in charges.
1
-
125446
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements