Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date10 Nov 2024
Closing Soon20 Nov 2024
Tender Amount₹ 27,00,000
Costs
EMD
₹ 2,70,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRZ_972606_95Tender No
3364/24A date-25/10/2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using Type-C with bitumen binder @ 0.65 kg/sqm including cost of bitumen as per Technical Specification Clause 510.
7800
60
468000
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
45
7500
337500
Earthwork in cutting or in embankment in ordinary soil , excavation to be in the form or regular pits not exceeding 0.50m in depth and earthwork in embankment to be in 20 cm layers, including ramming & dressing the surface to equired levels and slopes and also including liftup to 1.5 m and lead up to 30 m. The earthcutting to be used in making embankment or tobe deposited as spoil banks within 30m distance as directed by the Engineer - in - charge.
1215
80
97200
Maintance Cost of Ist Year for P.C. Work @ 0.00%
1.8
-
-
Maintance Cost of Ist Year for C.C. Work @ 0.00%
2.55
-
-
Maintance Cost of 2nd Year for P.C. Work @ 1.50%
0.1
306810
30681
Maintance Cost of 2nd Year for C.C. Work @ 0.25%
2.55
330
843.75
Maintance Cost of 3rd Year for P.C. Work @ 3.00%
1.8
34090
61362
Maintance Cost of 3rd Year for C.C. Work @ 0.50%
2.55
661
1687.5
Maintance Cost of 4th Year for P.C. Work @ 4.50%
1.8
51135
92043
Maintance Cost of 4th Year for C.C. Work @ 0.75%
2.55
992
2531.25
Maintance Cost of 5th Year for P.C. Work @ 6.00%
1.8
68180
122724
Maintance Cost of 5th Year for C.C. Work @ 1.00%
2.55
1323
3375
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%