Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date10 Nov 2024
Closing Soon20 Nov 2024
Tender Amount₹ 27,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using Type-C with bitumen binder @ 0.65 kg/sqm including cost of bitumen as per Technical Specification Clause 510.

7800

60

468000

... More
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501

45

7500

337500

... More
Earthwork in cutting or in embankment in ordinary soil , excavation to be in the form or regular pits not exceeding 0.50m in depth and earthwork in embankment to be in 20 cm layers, including ramming & dressing the surface to equired levels and slopes and also including liftup to 1.5 m and lead up to 30 m. The earthcutting to be used in making embankment or tobe deposited as spoil banks within 30m distance as directed by the Engineer - in - charge.

1215

80

97200

... More
Maintance Cost of Ist Year for P.C. Work @ 0.00%

1.8

-

-

... More
Maintance Cost of Ist Year for C.C. Work @ 0.00%

2.55

-

-

... More
Maintance Cost of 2nd Year for P.C. Work @ 1.50%

0.1

306810

30681

... More
Maintance Cost of 2nd Year for C.C. Work @ 0.25%

2.55

330

843.75

... More
Maintance Cost of 3rd Year for P.C. Work @ 3.00%

1.8

34090

61362

... More
Maintance Cost of 3rd Year for C.C. Work @ 0.50%

2.55

661

1687.5

... More
Maintance Cost of 4th Year for P.C. Work @ 4.50%

1.8

51135

92043

... More
Maintance Cost of 4th Year for C.C. Work @ 0.75%

2.55

992

2531.25

... More
Maintance Cost of 5th Year for P.C. Work @ 6.00%

1.8

68180

122724

... More
Maintance Cost of 5th Year for C.C. Work @ 1.00%

2.55

1323

3375



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.