Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date5 Dec 2024
Closing Date21 Dec 2024
Tender Amount₹ 1,81,90,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and spreading material on a prepared base, cement @ 4%by weight to the spread material manually, mix in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base.

1695

3850

6525750

... More
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Clause 503. MORD

12750

14

178500

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Case - II By Mechanical Means(HMP 30/40) (I) Bitumen VG-10

12750

160

2040000

... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10

12750

52

663000

... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1..

3979

75

298425

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

260

20

5200

... More
Providing concrete (1:3:6) for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. (MORD Ch.11 Ref.800-1200)

18.7

6600

123420

... More
Brick masonry work (1 cement : 3 coarse sand) cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (MORD Ch.11 Ref.12-600-1200)

52.7

6600

347820

... More
Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause MORD 613.3

144

80

11520

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

11.4

195

2223

... More
Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet (1000 mm dia hume pipe culvert)

7.5

5700

42750

... More
Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet (1000 mm dia hume pipe culvert double row)

7.5

11500

86250

... More
Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet (600 mm dia hume pipe culvert)

30

2450

73500

... More
Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet (350 mm dia hume pipe gule culvert)

37.5

1500

56250

... More
Providing and fixing of kilometer stone, hectometer stone, sign board and lettering & painting of culverts etc. as per direction of Engineer-in-Charge

3.4

15000

51000

... More
Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (I) Maintainance of First Year (@0% of Total Work Amount of 1 to 17)

1

-

-

... More
Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 2nd year @ 1.00% cost of work of Total work of amount 1 to 17)

1

165908

165908.58

... More
Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 3rd year @ 1.50% cost of work of Total work of amount 1 to 17)

1

248862

248862.87

... More
Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 4th year @ 2.00% cost of work of Total work of amount 1 to 17)

1

331817

331817.16

... More
Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 5th year @ 3.00% cost of work of Total work of amount 1 to 17)

1

497725

497725.74



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.