Public Works Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date22 Mar 2025
Closing Date28 Mar 2025
Tender Amount₹ 39,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Treated Base (W.M.M.) Providing, laying and spreading material on a prepared sub base,adding Cement at site @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of Base (By Manual). Including all taxes and labour cess but excluding GST

196

4850

950600

... More
Construction of Shoulder (Parti) with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 Including all taxes and labour cess but excluding GST

450

95

42750

... More
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35kg per sqm on the prepared surface cleaned with Hydraulic broom as per Technical Specification Clause 503 Including Biumen, all taxes and labour cess but excluding GST

2625

14

36750

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using VG-10 Bitumen and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 Including Biumen, all taxes and labour cess but excluding GST

2625

180

472500

... More
Providing and laying seal coat with VG-10 Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 A.By Manual MeansIncluding Biumen, all taxes and labour cess but excluding GST

2625

62

162750

... More
Earthwork in excavation for structures as per drawing and technical specification clause 305.1 ,including setting out,construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavted suitable material. Including all taxes and labour cess but excluding GST

31

35

1085

... More
Plain cement concrete 1:3:6 norminal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed placed in foundation and compected by vibration including curing for 14 days complete Including all taxes and labour cess but excluding GST

1.6

7200

11520

... More
Brick masonry work in 1:3 cement and coarse sand mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203. Including all taxes and labour cess but excluding GST

18

6800

122400

... More
Pointing with cement and fine sand mortar (1:3) on brick work in sub structure & super structure as per drawing & techinical specification clauses 613.3 & 1204 and 1208.4 Including all taxes and labour cess but excluding GST

64

70

4480

... More
Providing & Laying 1000 mm dia NP-3 RCC pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works, back filling conrete and masonary works in head walls and parapets. complete as per deriction of e / i . Including all taxes and labour cess but excluding GST

15

5500

82500

... More
Providing & Laying 350 mm dia Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets. Including all taxes and labour cess but excluding GST

20

1850

37000

... More
Maintenance of constructed P.C. Road for next five yrears after completion the contractor shall be paid total maintenance cost for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor.. (Including Labour cess but Excluding GST) (i) From completion of 1 Year to 2nd year 0.75

0.7

38000

26600

... More
(ii) 2nd year to 3rd year 1.5

0.7

76000

53200

... More
(iii) 3rd year to 4th year 2.25

0.7

114000

79800

... More
(iv) 4th year to 5th year 3.00

0.7

153000

107100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.