Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date12 Nov 2024
Closing Date18 Nov 2024
Tender Amount₹ 26,00,000
Costs
EMD
₹ 2,60,000Document Cost
₹ 854Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRT_972413_6Bid Award Id
ViewTender No
1949/3A Date 14.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cleaning the premix surface and laying seal coat type C with 6.7 mm nominal size grit (passing 9.5 mm sieve & retained on 2.36 mm nomianl sieve) and bitumen including heating the paint and grit upto required temperature and mixing including cartage of material at site, and including maintenance of side patries and watering them during operation of work complete as per specification and also including all labour, material T&P etc. required for proper completion of the work as directed by the Engineer-in-charges work .
6900
56
386400
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth and earth work in embankment to the in 20 cm. Layers including ramming and dressing the surface to required levels and slops and also including 1.50 m. lift and 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30m distance as directed by the Engineer–in charge. S.I. No.253(a)
920
78
71760
Excavation in foundation in soil mixed with mooram. Shingle, Kankar requiring the use of special tools and plant such as pickaxes, sables etc. including all lift and all lead including filling, watering and ramming of excavated earth into the trenches and disposal of suplus earth as directed by the Engineer-in-charge. (As per S.l. No. 251).
105
90
9450
Providing and laying in cement concrete 1:4:8 (1 cement 4 coarse sand : 8 graded stone ballast 40mm nominal size) and curing complete, including supply of all materials, labour and T&P etc. required for proper completion of the work as per direction of E/I) S.I. No. 281
21
4780
100380
R.C.C. Work with cement approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W. G.G.I., binding wire and including necessary centering and shuttering etc. and supply of all materials labour, Tools & plants etc. required for proper completion of the work, including cost of binding wire. The rate excludes making of drip course which shall be paid extra. SI No. 284
45.06
7400
333444
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend hooks, and authorized overlapping shall be measured and including cost of binding wire. SI.No. 504
2829.77
75
213081.68
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements