Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 Oct 2024
Closing Date5 Nov 2024
Tender Amount₹ 20,93,000
Costs
EMD
₹ 2,09,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRT_968686_1Bid Award Id
ViewTender No
5182/1A Dt. 18.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.
3000
74
-
Earth work in Embankment (For Patri) with ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in patries should be including ramming and dressing the surface to required levels and slopes as directed by the Engineer incharge. as per S.I. No. 253 a Including cost of, all material, Bitumen, labour, T&P, royality , all taxes and labour cess complete. But excluding GST.
600
100
-
Supplying Laying and Jointing of 350mm doa NP-3 type Hume pipe in position, Jointing with jute and stiff mixture of cement mortar in the proportion of 1:2 (1 Cement : 2 Fine sand) Including all cost of material, labour and T&P etc. and testing of joints complete in all respect.. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.
15
2415
-
Part (B) CC Part
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
31
4350
-
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST.
87.5
8050
-
Earth work in Patri repair with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a Carted Earth lead upto 3.00 Km as per Technical Specification Clause 301.5 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
120
210
-
Cost of maintenance for Bituminous work portion for IInd Year @ 1.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO
1048425
-
-
Cost of maintenance for Bituminous work portion for IIIrd Year @ 3.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO
1048425
-
-
Cost of maintenance for Bituminous work portion for IVth Year @ 4.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO
1048425
-
-
Cost of maintenance for Bituminous work portion for Vth Year @ 6.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO
1048425
-
-
Cost of maintenance for Cement Concrete work portion for IInd Year @ 0.25% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO
864425
-
-
Cost of maintenance for Cement Concrete work portion for IIIrd Year @ 0.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO
864425
-
-
Cost of maintenance for Cement Concrete work portion for IVth Year @ 0.75% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO
864425
-
-
Cost of maintenance for Cement Concrete work portion for Vth Year @ 1.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO
864425
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements