Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date16 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 44,60,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and rolling of open-graded Premix Carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen (VG-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in Hot mix plant, laying and finishing with paver finisher and compaction with three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal Coat 'Type-C' as per MORD Technical Specification Clause 508 including cost of bitumen. Case-II By Mechanical Means (HMP 30/40) (I) Bitumen VG-10

10875

165

1794375

... More
Providing and laying Seal Coat sealing the voids in a bituminous (VG-10) surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 including cost of bitumen. Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10.

10875

54

587250

... More
Construction of subgrade and Earthern shoulders with approved material obtained from borrow pits with a lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Tables 300-2 with a lead upto 1000 m as per Technical specification clause 303.1.

1300

75

97500

... More
Maintenance of bituminous surface road including filling potholes and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024 & Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 1st year @ 0.00% cost of work of Total work of amount 1 to 6)

1

-

-

... More
Maintenance of bituminous surface road including filling potholes and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024 & Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 2nd year @ 1.50% cost of work of Total work of amount 1 to 6)

1

56230

56230.31

... More
Maintenance of bituminous surface road including filling potholes and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024 & Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 3rd year @ 3.00% cost of work of Total work of amount 1 to 6)

1

112460

112460.63

... More
Maintenance of bituminous surface road including filling potholes and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024 & Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 4th year @ 4.50% cost of work of Total work of amount 1 to 6)

1

168690

168690.94

... More
Maintenance of bituminous surface road including filling potholes and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024 & Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 5th year @ 6.00% cost of work of Total work of amount 1 to 6)

1

224921

224921.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.