Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Civil Works Others
Excavation
Eprocure
Opening Date27 Nov 2024
Closing Date20 Dec 2024
Tender Amount₹ 25,12,00,000 
Notes
Download

Costs

Summary

Widening And Strengthening Of Manihari Jakhania Faddopur Marg Ch. 0.000 To 14.000 In Distt Ghazipur.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) as per direction of engineer-in-charge

8240

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (WMM) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) as per direction of engineer-in-charge

3942

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with 1% OPC cement ^ 3.5% emulsion in uniform layer with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (ETA) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) as per direction of engineer-in-charge

10722

-

-

... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )

4873

-

-

... More
Providing and laying tack coat with bitumen VG-10 using emulsion distributer at the rate of 0.20 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause no. 503 (I) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )

97475

-

-

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )

2924

-

-

... More
Providing and Laying of Rubber moulded (Red Colour) Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30m thick local sand on bend, filling joints with local sand on bend, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504. Rate As per SOR

4562

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling

2300

-

-

... More
Plain cement concrete 1:3:6 (M-10) nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

310

-

-

... More
Reinforced Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications.

744

-

-

... More
Supplying, fitting, and placing MS bar reinforcement in Drain complete as per drawing and technical specifications Clauses 1002, 1010 and 1202, for Bars below 36 mm dia including over laps and wastage, where they are not welded.

46

-

-

... More
Construction of sub-grade and earthen shoulders with approved material obtained from R.O.W. with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2

8363

-

-

... More
Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

51

-

-

... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.

108

-

-

... More
RCC Hume Pipes NP-3 (600mm) inculidng collars/spigot iointed with stiff mixture of cement in the proportion of 'l:2 (1 cement : 2 find sand) including testing of joints.

60

-

-

... More
RCC Hume Pipes NP-3 (900mm) inculidng collars/spigot iointed with stiff mixture of cement in the proportion of 'l:2 (1 cement : 2 find sand) including testing of joints.

20

-

-

... More
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 fineness modulous including supply of all materials, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. SI

188

-

-

... More
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.

14

-

-

... More
1st year- maintainance cost 0% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

14

-

-

... More
2nd year- maintainance cost 0.25% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

14

-

-

... More
3rd year- maintainance cost 0.50 % on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

14

-

-

... More
4th year- maintainance cost 0.75% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

14

-

-

... More
5th year- maintainance cost 1.00 % on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

14

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.