If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Eprocure
Opening Date3 Dec 2024
Closing Date10 Dec 2024
Tender Amount₹ 12,71,000
Costs
EMD
₹ 1,28,000Document Cost
₹ 856Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_979428_1Bid Award Id
ViewTender No
EE Ref No. 2163/4A Dt 20-11-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
25 mm thick 1:2:4 plain C.C Floor with cement , approved coarse sand and 20mm graded approved stone laid in panels finished with 3 mm floating coat of neat cement or cement and marble dust in 5:1 as specified over & including 8 cm thick base concrete consisting of cement, local sand and brick ballast 4 cm gauge in the proportion of 1:4:8 and removing any over lapping mortar at the joints of panels if any and given them a uniform finish including supply of all materials, labor and T&P etc. required for completion of the work.but without base concrete.as per Si no.604A (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
201
560
112560
... More
Murga jali as per sor (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
201
44
8844
... More
2cm (3/4") thick cement plaster in dedo or skirting in 1:2 consisting of one part of cement and 2 part of approved coarse sand laid in panels, finished with 3,, (1/8") floating coat of neat cement or cement and marble dust in ration of 5:1 including supply of all materials labour and T&P etc. required for proper completion of the work. as per sor 597 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
201
235
47235
... More
Providing and laying water proofing treatment in sunkeri portion WCs. Bathroom etc. by applying treatment slurry mixed with water proofing cement compound consisting of applying: a) First layer of slurry of cement @ 0.488 kg/sqm mixed with waterproofing cement compound @ 0.253kg/sqm. This layer will be allowed to air cure for 4 hours. B) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg / sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate included preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. as per sor no.cpwd 22.5 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
201
212
42612
... More
Providing and Laying vitrified floor tiles Kajaria KERRO Brand in difference size (thickness specified by manufacturer) with water absorption less than 0.8% and confirming to IS 15622 of approved make in all colors and shade laid on 20mm thick cement mortar 1:4 (Icement 4 coarse sand) including grouting the joints with white cement and matching pigments etc complete size of tiles 600x600mm as per CPWD 11:41:1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
296
1090
322640
... More
Mild steel or iron work in heavy sizes such as trusses, built up gates, record racks, roof work, gates etc. wrought to required from, including drilling holes riveting or welding where necessary &their fixing, required for proper completion of the work. SI no-503 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
530
70
37100
... More
Supply & fixing lf flush doors commercial quality conforming to IS. 2202 Part-1 (1983) including fixing of wooden cleats & stoppers and including fixing and adjustment of hinges, bolts locks, handles, springs and other fittings but excluding their supply and including painting with two coasts of black japan paint on iron fitting if necessary. Fitting with departmentally (35mm thick) SI No-470 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
12.6
1850
23310
... More
Door + window repair (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
20
1000
20000
... More
R.C.C. work with cement approved coarse sand and 2cm Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows, excluding its fixing and binding the same with 24B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including S/o all materials required for proper completion of the work. Binding wire to be supplied by the contractor free of cost.but for above but with 1:1.1/2:3 SI no-284 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
15.77
8750
137970
... More
Mild steel or iron in plain work such as in reinforced concreted or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured. SI no-504 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
12.3
6350
78105
... More
M-150 brick work in 1:4 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work.as per sor no.305b (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
14.2
5500
78100
... More
Scraping old white or color wash including disposal of refuse as directed by Engineer-in-charge within a distance of 60 meter (200 feet). As per 708 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1344
9
12096
... More
Wall painting (two coats) with plastic emulsion paint of First quality approved brand and manufacture on undecorated wall surface to give an even shade including thoroughly brushing the surface free from mortar droppings and other foreign matter and sand prepared smooth as per NBO 18.57 Page No-61 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
1344
82
110208
... More
Removing paints or barnish with paints remover or with caustic sida including supply of all material T&P etc. required for proper completion of work. S.i No- 657 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
92
50
4600
... More
Painting or varnishing new iron work in small area or new wood with every coat (up to one sq. meter) of ready mixed priming paint and one coat of approved superior quality ready mix paint of clear synthetic varnish including supply of materials labour and T&P etc. required for proper completion of work. Paint to be used should confirm to the ISI No. 103 1950. but for every coat on previously painted old wood or steel work. SI No-643 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
92
94
8694