Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Feb 2025
Closing Date10 Feb 2025
Tender Amount₹ 36,18,000
Costs
EMD
₹ 3,62,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMRT_1002473_8Tender No
458/28MS-S/2024 Date 17-01-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move ) SI No. 251A I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
210
-
18900
... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 1:3:6 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SI No. 279b I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
65
-
334750
... More
M-150 Brick Work in 1:3 (One cement & three coarse sand) mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work SI No. 307 I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
150
-
714750
... More
12 mm thick plaster with cement and approved coarse sand mortar in 1:3 over brick work minimum thickness not to be less than 1 cm including supply of all materials, labour, tools & plants etc required for proper completion of the work. SI No. 582a I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
657
-
118260
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slabs excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. as per S.I.No.284a I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
4
-
29600
... More
M.S. ( tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage ,bend hooks and authorised overlapping shall be measured and including cost of binding wire. SI No. 504 I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
2.5
-
17500