Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Eprocure
Opening Date3 Jan 2025
Closing Date10 Jan 2025
Tender Amount₹ 8,05,65,000
Costs
EMD
₹ 16,12,000Document Cost
₹ 2,725Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEALD_989440_1Bid Award Id
ViewTender No
11643/11Kam-B-Pra.Vritt/24-25 Dt 11.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
4742
-
-
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density
2964.35
-
-
... More
Wet Mix Macadam (Stablization with emulsion and cement)Providing, laying, spreading and compacting graded stone aggregate (45 mm to 22.4 mm@ 30 per cent, 22.4 mm to 2.36 mm @ 40 per cent, 2.36 mm to 75 micron@ 30 per cent) to (Stabilization with emulsion3.5% and cement 1% )wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
909
-
-
... More
Providing and applying tack coat first with bitumen VG-10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
68400
-
-
... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
2020
-
-
... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 90 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507 complete in all respects
1212
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the exca
1043.2
-
-
... More
Plain cement concrete M15 in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
260.8
-
-
... More
Reinforcement cement concrete RCC Garde M20 (Using Concrete Mixer) Complete as per drawing and technical Specification.
806.85
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications (as per SOR 504)
50.59
-
-