Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil Works Roads
Eprocure
Opening Date16 Mar 2020
Closing Date23 Mar 2020
Tender Amount₹ 89,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(M-25) R.C.C work for raft foundation with cement approved coarse sand and 2 cm. gauge approved dalla grit proportion of 1:1:2 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24BWGGI binding wire complete in all respect.

87.25

-

7604

... More
M-150 brick work in 1:3 cement and C.sand mortar in foudnation and plinth including all materials labour tools and plants etc. complete work.

190.8

-

5537

... More
Same as item no. above but in super structure including necessary cutting and moulding of brick complete in all respect.

146.9

-

5815

... More
Providing and fixing of weep holes with 110mm. dia P.V.C. pipe including supply of all materials labour tools and plants etc. complete work.

38.4

-

178

... More
(M-25)R.C.C. work with cement approved coarse sand and 2 cm. gauge approved dalla grit proportion of 1:1:2 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24BWGGI binding wire complete in all respect. for Bed block

4

-

7604

... More
(M-25)R.C.C. work with cement approved coarse sand and 2 cm. gauge approved dalla grit proportion of 1:1:2 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24BWGGI binding wire complete in all respect .

88.8

-

8651

... More
Mild steel or iron work in plain work such as R.C.C. or R.B. work complete in all respect. S.I.NO. 504

175.52

-

4438

... More
Plain/reinforced cement concrete(M-25) in open foundation(wearing coat) complete as per drawing and Technical specification

9.8

-

7604

... More
Struck cement pointing in 1:2 cement and fine sand mortar complete in all respect. S.I.NO. 574

219

-

56

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification

30.6

-

3583

... More
Providing and laying bolder Pitching for approns including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications

72

-

3682

... More
providing of pumping set with insulation dewatering of seapage in foundation with all material labour tools and plant etc required for proper compleat work

150

-

135

... More
Approach and Addl. Approach-Earth work for 95% proctor density mechanically compacted in embankment in ordinary soil excavation to be done in form of regular pits not exceeding 1/2M in depth and embankment work to be in 20cm. Layers including ramming dressing complete work. SI NO. (253(a)+253(b) & royalty charges (Carted Earth)

2580

-

141

... More
Earth work for 95% proctor density mechanically compacted in embankment in ordinary soil excavation to be done in form of regular pits not exceeding 1/2M in depth and embankment work to be in 20cm. Layers including ramming dressing complete work. SI NO. (253(a)+253(b) & royalty charges (Normal Earth)

4680

-

74

... More
Cement Treated Subbase :-Providing,Laying and Spreading Material on a prepared sub grade,adding cement @ 2% by weight to the spread material manually,mixing in place with rotavator and compacting with road roller at OMC to ahieve the desired unconfined compressive strength and to form a layer of sub-base.

259.18

-

4145

... More
Cement Treated base:- Providing,Laying and Spreading Material on a prepared sub base,adding cement @ 4% by weight to the spread material manually,mixing in place with rotavator and compacting with road roller at OMC to ahieve the desired unconfined compressive strength and to form a layer of base.

246.88

-

4376

... More
Providing and applying Tack coat with bitumen using pressure distributor at the rate of 3.5kg per 10 sqm. Area on the prepared bituminous/ granular surface cleaned with mechanical broom compelte as per Clause 503 of MORD specification no. 5.2

2468.75

-

12

... More
Cleaning the existing water bound surface and laying premix 2 cm. thick over a tack coat with graded approved grit and bitumen including roller, Machinery, heating the paint to the required temperature and mixing including cartage of materials, maintenance of side patries and watering them during operation for proper completion of the work.

-

-

173

... More
Cleaning the premix surface and laying Seal coat (Type "C") with approved 6-7mm. Graded grit and bitumen including Roller, Machinery annd heating the paint to the required temperature including cartage of materials, maintenance of patri and watering.

-

-

59

... More
Earth work in both side of road for making patries after construction including ramming dressing, levelling etc. required for proper completion of the work (Carted Earth)

37.5

-

141

... More
Earth work in both side of road for making patries after construction including ramming dressing, levelling etc. required for proper completion of the work (Normal Earth)

380

-

74

... More
Excavation in foundation in ordinary soil including lift upto 1.5M. and lead upto 30M. including watering ramming and dressing etc. and disposal of surplus earth as direction by E/I. upto a distance of 30M. from the foundation trenches complete in all respect. (Excluding G.S.T.)

-

-

93

... More
C.C. 1:4:8 cement, coarse sand 40mm. Gauge stone ballast including complete work (Excluding G.S.T.)

-

-

5955

... More
Supply of 600mm. Dia pipe.(Excluding G.S.T.)

-

-

2485

... More
M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth etc. required for proper completion of the work(Excluding G.S.T.)

-

-

5840

... More
Struck cement pointing in 1:3 cement sand mortar including supply of all materials labour tools and plants etc. required for proper completion of the work.(Excluding G.S.T.)

-

-

58



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.