Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date23 Dec 2024
Closing Date10 Feb 2025
Tender Amount₹ 55,00,000
Costs
EMD
₹ 4,75,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_985932_1Tender No
4440/35C-Banda Circle/2024 dated 07-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
80
4200
336000
... More
RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 in bed block and approach slab excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. SI No 283
150
6400
960000
... More
RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 in heavy slab upto 6 m span excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. SI No 286As in item (283) above but in RCC T-beam and slab roof and RCC columns in 1.1.5.3
150
7500
1125000
... More
Providing and laying boulder launching apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
200
1600
320000
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
3.5
74000
259000
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
13.5
74800
1009800
... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
6
7500
45000
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 617. 709, 1204.3.7
300
100
30000
... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall return wall to the full hight, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8
120
1600
192000
... More
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
850
89
75650
... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause
2800
88
246400
... More
Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime having minimum 70 per cent of contents of CaO, grading with motor grader and compacting with the smooth wheel road roller at OMC to the desired density to form a layer of improved Sub-grade as per Technical Specification Cluase 403.
400
330
132000
... More
Providing, laying, spreading Material on prepared sub grade adding cement @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength to form a layer of base.
56
2300
128800
... More
Providing, laying, spreading Material ona prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road rollar at OMC to achieve the desired unconfined compressive strength to form a layer of base.
75
2700
202500
... More
Providing and applying tack coat with Bitumen VG-10 using emulsion distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
530
18
9540
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A as per Technical Specification Clause 508.
530
145
76850
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, @ 0.65 kg/m2 as per Technical Specification Clause 510
530
53
28090
... More
Maintenance of concrete surface including crack sealing spot pitching inluding restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert, maintennance of guard rails and parapet.maintenance of road sign, speed breakers, standing tree at adjacent to road wherever required. maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-1) mentioned in GO No.17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc lettere No. 3689/C- OPRMC/MUL-2023-24 dated 17.02.2024 subjected to approval from Govt.Maintence of (1st year after completion of work @ Zero % of total cost of CC work)
1
-
-
... More
Maintenance cost for 2nd year @ 0.25% cost of CC work
1
13400
13400
... More
Maintenance cost for 3rd year @ 0.50% cost of CC work
1
26803
26803
... More
Maintenance cost for 4th year @ 0.75% cost of CC work
1
40204
40204
... More
Maintenance cost for 5th year @ 1.00% cost of CC work
1
53606
53606
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%