Public Works Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date22 Mar 2025
Closing Soon27 Mar 2025
Tender Amount₹ 92,70,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of sub-base.(Including labour Cess & Excluding GST)

307

3810

1169670

... More
Providing, laying and spreading material on prepared sub-base, cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of base.(Including labour Cess & Excluding GST)

566

4250

2405500

... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(Including labour Cess & Excluding GST)

1250

96

120000

... More
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30-0.40 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.(Including labour Cess & Excluding GST)

6581.25

14

92137.5

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Case - I By Manual Means (I) Bitumen (S-90) (Including labour Cess & Excluding GST)

6581.25

181

1191206.25

... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 A. By Manual Means Case - III : Type C (I) Bitumen (S-90) (Including labour Cess & Excluding GST)

6581.25

65

427781.25

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 (Including labour Cess & Excluding GST)

3.3

6640

21912

... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 I In 1:3 cement mortar (Including labour Cess & Excluding GST)

32.8

6770

222056

... More
Plastering with cement mortar (1:3), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 (Including labour Cess & Excluding GST)

3.9

218

850.2

... More
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 (Including labour Cess & Excluding GST)

77.6

74

5742.4

... More
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets - 350 mm dia hume pipe (Including labour Cess & Excluding GST)

37.5

1750

65625

... More
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets - 1000 mm dia hume pipe (Including labour Cess & Excluding GST)

30

6500

195000

... More
Maintenance of constructed road for next five year after the actual date of completion. The Contractor shall be paid total maintenance cost @ 7.5% on Construction cost. (Including labour Cess & Excluding GST) (i) 2nd Year Maintenece @ 0.75%

1.76

35897

63000.45

... More
(ii) 3rd year Maintenece 1.5%

1.76

71795

126000.87

... More
(iii) 4th year Maintenece 2.25%

1.76

107693

189001.32

... More
(iv) 5th year Maintenece 3%

1.76

143590

252001.77



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.