If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date24 Jan 2024
Closing Date30 Jan 2024
Tender Amount₹ 1,62,00,000 
Notes
Download

Costs

Summary

New Construction Work On Village Sarna To Village Kakda Tak Road New Construction

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.

800

2904000

3630

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502. Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.

11250

450000

40

... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared granular/Bituminous surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.

11250

123750

11

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 Including cost of, all material, Bitumen, labour, T&P, royality , all taxes and labour cess complete. But excluding GST.

11250

1912500

170

... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.

11250

720000

64

... More
Excavation in foundation in ordinary soil (Loam,clay or sand) upto 30 M and including lift upto 1.50 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches as per S.I. No. 251(a). Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST.

80

8800

110

... More
Providing and laying in cement concrete 1 : 4 : 8 (1 cement , 4 course sand, 8 graded stone ballast 40 mm nominal size) and curring complete, including supply of all materials, labour T&P etc. required for proper completion of the work as per direction of E/I. Including cost of all labour, T&P and all taxes complete. S.I. No. 281 but excluding GST. Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.

24

146400

6100

... More
First class brick work in 1:4 cement and coarse sand of 2.20 F.M. mortar in foundation and plinth including supply of all material, labour, curing and T&P etc. required for proper completion of the work as per direction of E/I. Including cost of all labour, T&P, labour cess and all taxes complete. S.I. No. 305(a).

50

258500

5170

... More
Supply and fixing of 600 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of all labour, T&P, labour cess and all taxes complete.

45

190800

4240

... More
Sturck pointing with cement mortar consisting of 1 part cement & 2 part of fine sand of 1.25 fineness modulus S.I.No. 574 Including cost of all material, labour, T&P, labour cess, royality and all taxes complete.

80

14800

185

... More
12 mm thick plaster with cement & approved fine sand in 1:4 over brick work minimum thickness not be less than 1 cm Including cost of all material, labour, T&P, labour cess, royality and all taxes complete. required for propor complition of the work S.I. No. 584

4.5

832

185

... More
Cement concrete with 2 cm gauge approved stone grit, coarse & cement in 4:2:1 including supply of all material, labour, Tools & Plants etc. required for proper completion of the work as per direction of E/I. Including cost of all labour, T&P, labour cess and all taxes complete. S.I. No. 279(a).

0.7

4935

7050

... More
Providing & fixing reinforced cement concrete M15 grade Ordinary Kilometre Stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703. Including cost of all labour, T&P, labour cess and all taxes complete.

4

11744

2936

... More
Providing & fixing reinforced cement concrete M15 grade 200 m Stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703. Including cost of all labour, T&P, labour cess and all taxes complete.

12

10080

840

... More
Brick edging on both side of the road of M-150 bricks 7 cm. wide. 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-charge. (As per SOR-20.06)

3

270000

90000

... More
Part-B Maintenance work Maintenance Charge including @ Earth Work, repair of painted surface, earthwork on patri, culvert, road furniture etc. as direction of E.I. for the period of five years from the actual completion of work. Maintenance cost for 2nd year @ 1% of total work amount S.No.1-18

1

164821

164821.42

... More
Maintenance Charge including @ Earth Work, repair of painted surface, earthwork on patri, culvert, road furniture etc. as direction of E.I. for the period of five years from the actual completion of work. Maintenance cost for 3rd year @ 1.5% of total work amount S.No.1-18

1

247232

247232.12

... More
Maintenance Charge including @ Earth Work, repair of painted surface, earthwork on patri, culvert, road furniture etc. as direction of E.I. for the period of five years from the actual completion of work. Maintenance cost for 4th year @ 2% of total work amount S.No.1-18

1

329642

329642.83

... More
Maintenance Charge including @ Earth Work, repair of painted surface, earthwork on patri, culvert, road furniture etc. as direction of E.I. for the period of five years from the actual completion of work. Maintenance cost for 5th year @ 3% of total work amount S.No.1-18

1

494464

494464.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.