Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date22 Nov 2024
Closing Soon27 Dec 2024
Tender Amount₹ 54,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
W.B.M (Grade-3) Providing, laying, spreading and compacting stone aggregates of specific sizes 53mm to 22.4mm to water bound macadam (G-3) specification including spreading in uniform loose thickness hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, Stone dust to fill-up the interstices of coarse aggregate, watering and compacting 7.50 cm thickness to the required density Grading 3 as per Technical Specification Clause 405. ( excluding GST)

251

3400

853400

... More
Brick edging 7.00 cm. wide on both sides of the road by M-150 bricks complete as per PWD detailed specification No. 20.15 as per Technical Specification clause .(excluding GST)

0.9

78000

69810

... More
Providing and applying Primer coat with bitumen emulsion using bitumen emulsion distributor at the rate of 0.70 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per Technical Specification Clause 502.(including emulsion but excluding GST)

3356.25

35

117468.75

... More
Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per Technical Specification Clause 503.(including bitumen but excluding GST)

3356.25

15

50343.75

... More
Providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 (13.2mm & 11.20mm in 2:1) mm aggregates either using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508.(including bitumen but excluding GST)

3356.25

185

620906.25

... More
Providing and laying seal coat sealing 6.7mm stone grit @0.009 Cum per sqm the voids in a bituminous grade VG-10 @0.65kg per sqm surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510.(including bitumen but excluding GST)

3356.25

65

218156.25

... More
Construction of subgrade and earthen shoulders with approved material obtained from R.O.W. with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. ( excluding GST)

400

60

24000

... More
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024

0.9

-

-

... More
1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.9

-

-

... More
2nd year- maintainance cost 0.75% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.9

28933

25895.51

... More
3rd year- maintainance cost 1.50 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.9

57867

51791.03

... More
4th year- maintainance cost 2.25% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.9

86800

77686.54

... More
5th year- maintainance cost 3.00 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.9

115734

103582.05

... More
Construction of embankment with approved material obtained from R.O.W. with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 ( excluding GST)

140

70

9800

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on preared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achive the desired denisty, complete as per Technical Specification clause 401. ( excluding GST)

18

2850

51300

... More
W.B.M (Grade-3) Providing, laying, spreading and compacting stone aggregates of specific sizes 53mm to 22.4mm to water bound macadam (G-3) specification including spreading in uniform loose thickness hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, Stone dust to fill-up the interstices of coarse aggregate, watering and compacting 7.50 cm thickness to the required density Grading 3 as per Technical Specification Clause 405. ( excluding GST)

28

3400

95200

... More
Construction of un-reinforced, expansion and construction joint only, plain cement concrete pavement, thikness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (Grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 Cum capacity and apprpriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micronthik polythene film, wedges, steel plates including leveling the formwork as per drawing) spreading the concrete with shovels, rakes, compacted using needle, screed and platevibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying sealant, near approaches to bridge/ culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days and water finishing to lines and grades as per drawing and Technical specification clause 1501 and as per direction of E-In-C fo work. ( excluding GST)

56

7900

442400

... More
Construction of subgrade and earthen shoulders with approved material obtained from R.O.W. with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. ( excluding GST)

50

60

3000

... More
Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. ( excluding GST)

10

5500

55000

... More
R.C C. work with cement approved coarse sand and 2cm Gauge approved stone ballast n the proportion of 1:1.5:3 in lintels oidoors and windows, excluding its fixinq and binding the same with 24B.W.G.G.l binding wire and rnc uding necessary centering and shuttering etc. and also including S/o all materials required for proper comp etion of the work Binding wire to be supplied by the contractor free of cost ( excluding GST)

60

7400

444000

... More
Supplying, fitting, and placing MS bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202, for Bars below 36 mm dia including over laps and wastage, where they are not welded. ( excluding GST)

2

63000

126000

... More
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024

0.1

-

-

... More
1st year- maintainance cost 0% on CC, Drain Etc Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.1

-

-

... More
2nd year- maintainance cost 0.25% on CC, Drain Etc Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.1

30667

3066.75

... More
3rd year- maintainance cost 0.50 % on CC, Drain Etc Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.1

61335

6133.5

... More
4th year- maintainance cost 0.75% on CC, Drain Etc Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.1

92002

9200.25

... More
5th year- maintainance cost 1.00 % onCC, Drain Etc Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.1

122670

12267



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.