Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date15 Jan 2024
Closing Date27 Jan 2024
Tender Amount₹ 1,38,50,000
Costs
EMD
₹ 8,93,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEKNP_877639_3Bid Award Id
ViewTender No
5683 M/39 M-K.F.V./2023/KNJ Date 21.12.2023Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
548.44
2495402
4550
Providing and applying primer coat with bitumen emulsion(SS-1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. as per Technical Specn. No. 502
7312.5
292500
40
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface treated with primer and cleaned with hydraulic broom as per Technical Specn. No. 503
7312.5
109687
15
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration or Emulsion grade bitumen to required line grade and level to serve as wearing coarse on a previously prepared base by manual means including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades to be followed by seal coat as per T.S.C. 508
7312.5
1301625
178
Providing and laying seal coat by manual means with 80/100 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per TSC 510
7312.5
475312
65
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
2010.94
191039
95
Brick edging on both sides of the road of 1st Class Brick 8cm wide and 12cm deep, laid with mud mortar, including all labour and supply of bricks, finished to required template and porper alignment, also including dressing and ramming the excaveted earth as per direction of engineer in charge as per SOR
1.95
144300
74000
Providing & Fixing Stone, Hectometer stone & sign board et. complete.
2
5442
2721.38
Earth Work in foundation in trenches in ordinary soil including a lift up to 1.50 mt & lead up to 30mt.
183.24
24737
135
Providing laying in cement concrete 1:4:8 ( 1 Cement : 4 Fine sand : 8 stone aggregates 40MM nominal Size) and curing complete including cost of form work in foundation and floors as per SI No. 275 of SOR Kannauj Farrukhabad circle.
19.6
109760
5600
Cement Concrete of 1:2:4 in cement Fine sand and aproved 20mm gauge stone ballast in DPC
0.05
325
6650
Brick Work in 1:3 cement and fine sand mortar in toundation and plinth (parapit)
22.12
117236
5300
Struct cement pointing with 1:2 cement & fine sand mortar in parapits
67.52
10803
160
Supply of 900 mm dia R.C.C. Hume pipe NP3 with coller
30
166770
5559
Laying and fixing of 900 mm dia R.C.C. Hume pipe NP3 with coller in position
30
11550
385
Maintenance of bituminous surface road and gravel or WMM road including filling pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes /berms, making of berms/ shoulders, maintenance of drain, maintenance of culvert, maintenance of guard rails and parapet, maintenance of road sign , speed breakers, standing tree at adjacent to road whatever required, maintenance of hectometer and kilometer stone cutting of branches of tree, shrub and trimming of grass and weed etc. white washing of parapet including CD work, painting of guard stone, refixing of displaced guard stone as per performance Index Anexure-1 mentioned in GO No. 55/2022/187/23-9-2022-02 Nabard/2021 Dt. 28.04.2022 & EnC Letter no. 14/BBD-1(NH)/ 40MT-11/2024 dated 03.01.2024 subjected to Approval from Govt. Maintenance of 1st year after completion of work @ Zero% of cost of construction of work/BOQ
1
-
-
Item No 19 but Maintenance of Second Year after completion of work (1.00% of item 01 to 18)
1
128647
128647
Item No 19 but Maintenance of Third Year after completion of work (1.50% of item 01 to 18)
1
192970
192970
Item No 19 but Maintenance of Fourth Year after completion of work (2.00% of item 01 to 18)
1
257294
257294
Item No 19 but Maintenance of Fifth Year after completion of work (3.00% of item 01 to 18)
1
385941
385941
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements