Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date16 Nov 2024
Closing Soon22 Nov 2024
Tender Amount₹ 32,30,000
Costs
EMD
₹ 3,23,000Document Cost
₹ 1,267Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEKNP_974462_15Tender No
3059/12A/Tender/2024 Dated 14-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying Seal Coat sealing the voids in a bituminous (VG-10) surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 including cost of bitumen. Bitumen VG-10. Case-III Type C By Mecahanical Means (HMP-30/40) (I)
8425
55
463375
Construction of subgrade and Earthern shoulders with approved material obtained from borrow pits with a lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Tables 300-2 with a lead upto 1000 m as per Technical specification clause 303.1.
90
78
7020
Maintenance of bituminous surface road including filling potholes
and patch repair etc. restoration of rain cuts and dressing of side slopes / shoulders, drain, culvert, guard rail and parapet, road sign, speed breakers, standing tree adjacent to road wherever required, kilometer and hectometer stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc.white whashing of parapet including CD Work, painting of guard stones and Re-fidding of displaced guard stones etc. as per direction of E/I for the period of five years from the actual completion of work. (Excluding GST) (as per performance index annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.10.2024
& Enc letter no 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (Maintenance cost for 1st year @ 0.00% cost of work of Total work of amount 1 to 5)
1
-
-
Maintenance cost for 2nd year @ 1.50% cost of work of Total work of amount 1 to 5
1
32754
32754.11
Maintenance cost for 3rd year @ 3.00% cost of work of Total work of amount 1 to 5
1
65508
65508.23
Maintenance cost for 4th year @ 4.50% cost of work of Total work of amount 1 to 5
1
98262
98262.34
Maintenance cost for 5th year @ 6.00% cost of work of Total work of amount 1 to 5
1
131016
131016.45
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405.
35
3850
134750
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
112.5
7700
866250
Maintenance of Concrete surface including Crack Sealing spot patching including restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culverts and cause ways,maintennance of guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 (Maintenance cost for 1st year @ 0.00% cost of work of Total work of amount 11 to 12)
1
-
-
Maintenance cost for 2nd year @ 0.25% cost of work of Total work of amount 11 to 12.
1
2502
2502.5
Maintenance cost for 3rd year @ 0.50% cost of work of Total work of amount 11 to 12.
1
5005
5005
Maintenance cost for 4th year @ 0.75% cost of work of Total work of amount 11 to 12.
1
7507
7507.5
Maintenance cost for 5th year @ 1.00% cost of work of Total work of amount 11 to 12.
1
10010
10010
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%