Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date5 Jan 2022
Closing Date11 Jan 2022
Tender Amount₹ 2,51,90,000
Costs
EMD
Refer DocumentsDocument Cost
₹ 2,336Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_CEALD_671929_1Bid Award Id
ViewTender No
No 12048/49/11ComB Dt 14-12-2021Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing, laying, spreading and compacting stone aggregates of 53 mm to 22.4 mm @ 0.91 cum per 10 sqm for compacted thickness of 75 mm and Stone Dust (Dust Shankargarh) @ 0.18 cum per 10 sqm (WBM G -3) Shankargarh Stone to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, a MORD Specific - ations 405.3
843.75
-
3200
... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
9750
-
38
... More
Providing and applying tack coat with bitumen VG-10 Grade using Bitumen pressure distributor @ 0.35 kg per sqm on the prepared granular surfaces (treated with primer on new WBM surface only) & cleaned with broom as per Technical Specification Clause 503.
9750
-
17
... More
Providing, laying and rolling of open-graded premix Surfacing of 20mm thickenss composed of Crushed stone grit, 13.2 mm & 11.20 mm @ 0.27 cum per 10 sqm (13.2mm @ 0.18cum and 11.2 @ 0.09 cum Kabrai/ Dala Grit) aggregate using Viscosity grade bitumen VG-10 to required line, grade and level to serve as wearinig course on a perviously prepared base Including mixig in a suitable plant laying and rolling with a smooth wheeled roller 8-10 tonne capaciry finished to required level and grade.
9750
-
156
... More
Providing and Laying Seal coat with Crushed Stone chipping of 6.7 mm size 100% passing 11.2 mm sieve and retained on 2.36 mm sieve applied @ 0.09 cum per 10 Sqm, (Dala/Kabrai Grit) for Sealing the voids in bituminous surface (20mm Primix Carpet) laid to the specified levels, grade and cross fail using Type-C Seal coat.
9750
-
55
... More
Brick edging on both sides of the road of brick class M-150, 8 cm wide and 12 cm deep laid with mud mortar including labour & supply of bricks finished to required template and in proper alignment and also including dressing & ramming the excavated earth as directed by the engineer incharge of the work including material labour & T&P etc for prpper completion of work.
2.6
-
66500
... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
225
-
7100
... More
Earth work in excavation of Foundation of Structure as per drawing and technical specification Clause 305.1, including setting out, construction of shoring and bracing, removal of stumps and other delerious matter, dressing of sides and bottom, backfilling the excavation earth of the extend required and complete the work as per Direction of E/I
1525.2
-
86
... More
Providing concrete Reinforced concrete in open foundation complete , as per drawing and technical specification clause 1100 & 800 P.C.C. Nominal mix 1:3:6 as per MORD Specification.
215.02
-
5450
... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, As per MORD Specification.
889.89
-
5700
... More
RCC 1:1.5:3 Rainforced Cement concrete m-20 super Sturcture complete as per Drawing and Technical Specificaion. Super Structure
151.01
-
6500
... More
Plain Cement Concrete M-20 Open Foundation complete as per Drawing and Technical Specification
13.63
-
6000
... More
Supplying, fitting and placing HYSD bar reinforcement in SUB-structure complete as per drawing and technical specifications.
118.54
-
4700
... More
Flush Pointing with Cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 Fineness modulus. Including supply of all material, labour and T&P etc required for proper completion of the work. As per MORD Specification.
880.03
-
65
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
1.26
-
160
... More
Supply of 350 mm dia NP-3 Hume pipes As per Technical Specification and Direction of E/I
60
-
835
... More
Laying of 350mm dia NP-3 Hume pipes As per Technical Specification and Direction of E/I
24
-
255
... More
Supply of 600 mm dia NP-3 Hume pipes As per Technical Specification and Direction of E/I
90
-
1615
... More
Laying of 600mm dia NP-3 Hume pipes As per Technical Specification and Direction of E/I
36
-
330
... More
Supply of 900 mm dia NP-3 Hume pipes As per Technical Specification and Direction of E/I
52.5
-
3485
... More
Laying of 900mm dia NP-3 Hume pipes As per Technical Specification and Direction of E/I
21
-
455