Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date22 Jan 2025
Closing DateCancelled
Tender Amount₹ 2,89,32,958.44 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 16,50,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMRT_996343_1Tender No
587/96M/E-TENDER/BSR CIRCLE/2024-25 Dated 21.01.2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
1690
3800
6422000
... More
Supply & laying of 80mm thick Precast cement concerete I-Shape Interlocking paver block ISI mark confirming to IS: 15658-2006 with top layer of minimum 5 mm thinkess having plan dimension 200x(160+120mm) of O.P. Cement, smooth high gloss finish, skid resistant, manufactured from rubber moulds through vibrocom-pression mechanism. The compressive strength of concrete paver block shall not be less than 40 Mpa and weight 4.5kg per including cost of material, with a blanket layer of 4.00cm thick fine sand including labour, T&P etc required for proper completion of the work as directed by Engineer-in-charge. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
7200
760
5472000
... More
Concrete with 4 cm. gauge Stone ballast, Fine sand of 1.25 F.M. and cement, in proportion of 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
72
5300
381600
... More
Reinforcement Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 1:1.5:3 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding steel & GST.
281
7500
2107500
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
22400
70
1568000
... More
(1) Emulsion Treated Aggregate Base (Wet Mix Macadam + Cement+Emulsion) Providing Laying and Spreading of graded stone aggregate (WMM) after mixing with water at OMC in machanical Mix Plant carriage of mixed material by tipper to site, laying with 1%OPC cement, (ACC, Birla Uttam , J.K. Super Brand) and 3.50% Hincol Emulsion SS-2 in uniform single layer on sub base/ subgrade and compacting with the road roller to achieve the desire density. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
765
8050
6158250
... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
7925
11
87175
... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Mort&H Specification clause No. 507 complete in all respects
317
11860
3759620
... More
Earth work in Embankment in patrie with Carted Earth distance not less than 1 Km. from site of work & also including ramming & dressing the surface to required levels & slopes and also including 1.50 M lift and 30 M lead. required for proper completion of work Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
300
175
52500
... More
05 years Maintenance Charge @ 2.5%
Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. First year Maintenance Charge @ 0.00%
18415037.5
-
-
... More
Second year Maintenance Charge @ 0.25 %
18415037.5
-
46037.59
... More
Third year Maintenance Charge @ 0.50%
18415037.5
-
92075.19
... More
Fouth year Maintenance Charge @ 0.75%
18415037.5
-
138112.78
... More
Fifth year Maintenance Charge @ 1.00%
18415037.5
-
184150.38
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements