Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Eprocure
Opening Date27 Sep 2024
Closing Date4 Oct 2024
Tender Amount₹ 32,46,000
Costs
EMD
₹ 3,25,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEALD_960110_1Tender No
1920/19A/2024-25 Date 13-09-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.GST will be paid extra as per prevelling rules.
900
10800
12
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 80-100 KN capacity, finished to required level and grades to followed by seal coat.GST will be paid extra as per prevelling rules.
900
157500
175
Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .GST will be paid extra as per prevelling rules.
900
54000
60
CC Work
-
-
-
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
202
1616000
8000
Maintenance Charges 5 Years from the Actual completion of Work for PC
-
-
-
Maintenance cost of Ist year
1
-
-
Maintenance cost of 2nd year @ 1.50 % cost of Work
1
7063
7063.5
Maintenance cost of 3rd year @ 3.00 % cost of Work
1
14127
14127
Maintenance cost of 4th year @ 4.50 % cost of Work
1
21190
21190.5
Maintenance cost of 4th year @ 6.00 % cost of Work
1
28254
28254
Maintenance Charges 5 Years from the Actual completion of Work for CC
-
-
-
Maintenance cost of Ist year
1
-
-
Maintenance cost of 2nd year @ 0.25 % cost of Work
1
4040
4040
Maintenance cost of 3rd year @ 0.50 % cost of Work
1
8080
8080
Maintenance cost of 4th year @ 0.75 % cost of Work
1
12120
12120
Maintenance cost of 4th year @ 1.00 % cost of Work
1
16160
16160
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements