Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date1 Feb 2024
Closing DateCancelled
Tender Amount₹ 1,62,00,000
Costs
EMD
₹ 10,10,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEALG_888191_8Tender No
419/Cashier(C.D.-1 A.)-A.C./23-24 Date 23-01-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregates, watering and compacting to the required density Grading 3 as per Technical clause 405(3), of MORD specification & as per direction of E/I. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
675
2632500
3900
... More
Brick edging on both side of the road of M-150 bricks 8cm. (3") wide and 12cm (4½") deep laid with mud mortar including all labour and supply of brick finished to required template & ramming the excavated earth as directed by the Engineer-In-Charge. Ch-20, S.I. 765 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
2.1
168000
80000
... More
Providing and applying prime coat with Bitumen emulsion on prepared surface of granular base including cleaning of road surface etc and spraying primer at the rate of 0.70/Sqm. using mechnical means as per Technical Specification. Clause 502, S.L.-5.10, of MORD specification (Including cost of Emulsion SS-2) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
7875
259875
33
... More
Providing and applying Tack coat with Bitumen VG-10 using distributor at the rate of 0.35Kg. per Sqm. on the prepared primed surface cleaned with Air Compressor as per Technical Specification. Clause 503, S.L.-5.20, of MORD specification. (Including cost of Bitumen VG-10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
7875
110250
14
... More
Providing,laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm. to 5.60 mm. aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN. static roller capacity, finished to required level and grades to be Seal coat as per Technical Specification. Clause 508, of MORD specification including cost of Bitumen as per direction of E/I. (Including cost of Bitumen VG-10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
7875
1409625
179
... More
Providing,laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type 'C' as per Technical Specification. Clause 510, of MORD specification including cost of Bitumen as per direction of E/I. (Including cost of Bitumen VG-10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
7875
496125
63
... More
CEMENT CONCRETE PAVEMENT(C.C ROAD)
construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel laying and fixing of 125 micron thick plastic sheet, wedges steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continuous opration including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501. Ch-20, S.I. 20 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
168.75
1299375
7700
... More
Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 & 300.2 as per Technical Specification Clause 303.5. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
1500
180000
120
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. Ch-4, S.I. 251 (For Drain+H.P.) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
123
18450
150
... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. Ch-5, S.I. 275(a) (For Drain+H.P.) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
18.6
109740
5900
... More
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level : a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Ch-5, S.I. 6 (For Drain) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
35
287000
8200
... More
Supplying, fitting, and placing HYSD bar reinforcement in Foundation complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 (For Drain) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
20
166000
8300
... More
Supply/Laying of dry OBB in Hume pipe culvert foundation including all materials, labour and T&P complete.As per SOR CH 1 SI 2(a) &Ch-20, S.I 755(b) (For H.P. Culvert) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
6
9900
1650
... More
Class-150 brick work in 1:4 cement and coarse sand mortar in foundation, plinth and SS including supply of all material, labour and T&P etc. required for proper completion of the work.as per SOR CH 6, SI 307 (For H.P. Culvert) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
54.4
299200
5500
... More
12 mm cement plaster on brick work with cement mortar of mix (upto 10 mtr height from Ground level.as per SOR CH 13, SI 584(i) (For H.P. Culvert) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
4.2
798
190
... More
Ruled Pointing on brick work with cement mortar 1:3 (1Cement : 3 Coarse Sand) as per SOR CH 13, SI 574(a) (For H.P. Culvert) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
45.5
6142
135
... More
Supply, laying & fixing of N.P.-3 Hume Pipe 350mm Dia. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
15
27525
1835
... More
Supply, laying & fixing of N.P.-3 Hume Pipe 600mm Dia. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
22.5
67207
2987