Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Eprocure
Opening Date6 Jan 2025
Closing Soon17 Jan 2025
Tender Amount₹ 1,08,00,000
Costs
EMD
₹ 7,40,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEGKP_984313_11Tender No
201/76Yat-Deoria Circle/24 Date 04.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous granular surface cleaned with mechanical broom.(Excluding GST)
9000
13
-
... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. (Including all taxes required and hire charges of road roller & including Cost of bitumen )(Excluding GST)
9000
202
-
... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Including all taxes required and hire charges of road roller & including Cost of bitumen )(Excluding GST)
9000
68
-
... More
Earth work in Patri or embankment in ordinary soil loam, clay or sand in patries on both side of road including ramming dressing required to proper completion of work including all labour T&P etc all complete. as per S.I. NO. 253.(Excluding GST)
650
95
-
... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m & lead upto 30 m including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trenches (Excluding Royalty). Sl. No. 251.(Excluding GST)
44.55
110
-
... More
Cement concrete with 4 cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.SI.No. 281(Excluding GST)
12.3
5435
-
... More
First Class brick work with 1:4 cement and coarse sand in foundation and plinth including supply of all materials labour and T&P etc. Requuired for proper completion of work as per S.I No. 305(b).(Excluding GST)
15.78
4550
-
... More
Struck pointing in 1:2 cement and fine sand mortar on brick work including supply of all materials, labour and T&P etc Requuired for proper completion of work as per S.I No. 574.(Excluding GST)
63.42
173
-
... More
Supply of 600 mm dia NP3 hume pipe.(Excluding GST)
22.5
2100
-
... More
Laying of NP-3 Hume Pipe.(Excluding GST)
9
440
-
... More
5 Year Maintenance
Second Year after actual completion of work @ 1.0%
1
-
-
... More
Third Year after actual completion of work @ 1.5%
1
-
-
... More
Fourth Year after actual completion of work @ 2.0%
1
-
-
... More
Fifth Year after actual completion of work @ 3.0%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%