Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date10 Dec 2024
Closing Soon16 Jan 2025
Tender Amount₹ 1,27,93,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
cement treated Base Providing, laying, spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road rollar at OMC to achieve the desired unconfined compressive strength to form a layer of base.

1312.5

2800

3675000

... More
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503.

9375

16

154687.5

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable mixall, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat Type C as per Technical Specification Clause 508.

9375

139

1303125

... More
Seal Coat Providing and laying seal coat by Manual Means with VG-10 Grade Bitument sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510

9375

50

468750

... More
Construction of subgrade and earthen shoulder with approved matarial obtained from borrow pit with all lift and lead, transporting site ,spreading,grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 300.1 including stablization with 2% slaked lime including its mixing with rotavetor complete (in Patri)

2600

308

800800

... More
Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches.

80

120

9600

... More
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 6:3:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.

8

4000

32000

... More
12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 2 part of find sand of 1.25 fineness modulus.

2.5

130

325

... More
Fine Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km. (5 miles) from the side of work & including watering,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. S.I.No-255

7

1000

7000

... More
Bedding for Pipe Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)

4

1050

4200

... More
Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. (Chpt-8 Add Item (b)

79.8

3500

279300

... More
Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work S.I.No-577

80

140

11200

... More
Cement concrete with 20mm gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (As per Chap-5 S.I. No. 279a)

0.8

5000

4000

... More
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.

1.4

4200

5880

... More
Providing and laying of hume pipe NP-3 for culverts with filing of joints in cement and sand mortar in 1:2 including labour, T&P etc required for proper completion of work as per of Engineer-in-Charge.1000 mm dia

15

5500

82500

... More
Providing and laying of hume pipe NP-3 for culverts with filing of joints in cement and sand mortar in 1:2 including labour, T&P etc required for proper completion of work as per of Engineer-in-Charge.600 mm dia

15

2400

36000

... More
Supply & Laying cement concrete pipe NP-3 350 mm dia (burried Conduits) on first calss bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation protection works, backfilling. concrete and masonary work in head wall and parapoets as per MORD specification no. 1100 sr no. 9.7 as per Data book item no. 9.70

20

1400

28000

... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 20 (Excluding G.S.T.) Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 20)

1

-

-

... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 20 (Excluding G.S.T.) Maintainance of Second Year (@0.75% of Total Work Amount of 1 to 20)

1

89252

89252

... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 20 (Excluding G.S.T.) Maintainance of Third Year (@1.50% of Total Work Amount of 1 to 20)

1

178505

178505

... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 20 (Excluding G.S.T.) Maintainance of Fourth Year (@2.25% of Total Work Amount of 1 to 20)

1

267757

267757

... More
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 20 (Excluding G.S.T.) Maintainance of Fifth Year (@3% of Total Work Amount of 1 to 20)

1

357009

357009



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.