If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Road Construction
Eprocure
Opening Date19 Nov 2024
Closing Date10 Dec 2024
Tender Amount₹ 14,73,00,000
Costs
EMD
₹ 29,46,000Document Cost
₹ 5,590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_975395_1Tender No
86/Camp/SE Tender/jnp-gzp circle/24 date 14-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Stablized Sub-base (FDR Technology)- Providing, laying, spreading and compacting of existing granular material adding cement using truck mounted / self propelled cement spreader shall have variable working width with microproces., controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller Pneumatic roller and vibratory pad Foot pad roller (20 tonne) to achieve design uncofined compresive Stgrength. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) as per direction of engineer-in-charge.
16197
-
-
Providing, laying, spreading of graded stone aggregate (WMM ) After Mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement & 3.5% emulsion in uniform singal layer on sub- base / base gread and compacting with the road roller to achieve the desired density (ETA). (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) as per direction of engineer-in-charge
8098
-
-
Providing and laying tack coat with bitumen VG-10 using emulsion bitumen distributer at the rate of 0.20 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause no. 503 (I) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
80987.5
-
-
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
3239.5
-
-
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from ROW with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
3239.5
-
-
Construction of U type drain
Earth work in excavation of foundation for drain as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
218
-
-
PCC M15 in Foundation Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation.(Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
33
-
-
Reinforced Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications.(Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
73
-
-
Supplying, fitting, and placing MS bar reinforcement in Drain complete as per drawing and technical specifications Clauses 1002, 1010 and 1202, for Bars below 36 mm dia including over laps and wastage, where they are not welded.. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
4.6
-
-
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.
14.73
-
-
1st year- maintainance cost 0% on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
14.73
-
-
2nd year- maintainance cost 0.25% on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
14.73
-
-
3rd year- maintainance cost 0.50 % on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
14.73
-
-
4th year- maintainance cost 0.75% on Bituminous &drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
14.73
-
-
5th year- maintainance cost 1.00 % on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
14.73
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%