Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date26 Dec 2024
Closing Soon1 Jan 2025
Tender Amount₹ 2,98,10,004.17 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.

1585

3300

5230500

... More
Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.

6600

880

5808000

... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per SOR Sl. No.-275)

72

4300

309600

... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work (As per SOR Sl. No.-279)

259.2

6870

1780704

... More
Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hooks and authorised overlapping shall be measurised as per direction of Engineer-in-charge.

25500

78

1989000

... More
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Aanalysed) Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.

400

4000

1600000

... More
Providing and applying tackcoat with VG-10 bitumen using pressure distributor at the rate of 0.25 kg. per sqm. On the prepared bitumenous surface cleaned with mechanical broom. (MORTH clause 503) Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.

4175

12

52187.5

... More
Providing, laying, spreading and compacting graded stone aggregate to ETA/wet mix macadam conforming to table 400-13 of MORTH specification including premixing the Material with water at OMC in mechanical mix plant with 1% Ordinary Portland Cement and 3.5% Emulsion SS-2 Stab,carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.as per Morth Spacification clause 406 S.I no 4.15 Including all taxes Including cost of all material, labour, T&P etc., labour cess, royalty and all taxes complete but excluding GST.

790

7700

6083000

... More
Providing and applying tackcoat with VG-10 bitumen using pressure distributor at the rate of 0.20 kg. per sqm. On the prepared bitumenous surface cleaned with mechanical broom. (MORTH clause 503) (Aanalysed)

7925

10

79250

... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Mort&H Specification clause No. 507 complete in all respects

317

11000

3487000

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.

256

125

32000

... More
(C.C. Work) 05 years Maintenance Charge @ 2.5% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. First year Maintenance Charge @ 0.00%

14567981.5

-

-

... More
Second year Maintenance Charge @ 0.25 %

14567981.5

-

36419.95

... More
Third year Maintenance Charge @ 0.50%

14567981.5

-

72839.91

... More
Fouth year Maintenance Charge @ 0.75%

14567981.5

-

109259.86

... More
Fifth year Maintenance Charge @ 1.00%

14567981.5

-

145679.82

... More
(Bitiminous Work) 05 years Maintenance Charge @15% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. Frist year Maintenance Charge @ 0.00%

12937237.5

-

-

... More
Second year Maintenance Charge @ 1.50 %

12937237.5

-

194058.56

... More
Third year Maintenance Charge @ 3.00%

12937237.5

-

388117.13

... More
Fourth year Maintenance Charge @ 4.50%

12937237.5

-

582175.69

... More
Fifth year Maintenance Charge @ 6.00%

12937237.5

-

776234.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.