Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date19 Dec 2024
Closing Soon24 Dec 2024
Tender Amount₹ 59,43,000
Costs
EMD
₹ 4,98,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUBZ_984738_1Tender No
4999/4E Nivida Basti Vritta/24 Date 25-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
(Cement Treated Base) Providing, Laying and spreading Material on prepared sub base adding cement @ 4% by weight to the spread material manualy, mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of Base.
370.31
5395
1997822.45
... More
Providing and applying tack coat with Bitumen (VG-10) at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer complete as per Technical Specification Clause 503 for proper completion of work as per direction of Engineer-in-charge.
3750
15
56250
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. for proper completion of work as per direction of Engineer-in-charge.
3750
205
768750
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 for proper completion of work as per direction of Engineer-in-charge.
3750
71
266250
... More
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not not exceding 0.50 mt. in depth and work in embankmet to be n 20 cm. layers includding ramming and dressing the surface to required level and slope and also including 1.5 mt. lift and 30 mt. lead as per SL. No.253 detailed specification & direction of E/I. for Making Shoulders.
903
95
85785
... More
Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.5 metre (5 fts) and lead upto 30m (100 fts) & including filling watering and ramming of excavation earth into the trenches or into the space between the building and the s
43.34
115
4984.1
... More
Cement Concrete with 4 cm. (1½") gauge approved Bricks ballast ,approved coarse sand and cement in the proportions or 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work .(SI No-280
8.38
6100
51118
... More
First class brick work in 1:3 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials , labour and T&P etc. required for proper completion of the work .SI No-306
13
4890
63570
... More
First class brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials , labour and T&P etc. required for proper completion of the work .SI No-307
3.52
5160
18163.2
... More
Struck pointing with cement mortar consisiting of 1 part cement and 2 part fine sand of F.M 1.25 including supply of all materials labour and T&P etc required for proper completion of the work SI No-574
35.46
170
6028.2
... More
Supply of NP-3 Hume pipes
15
2665
39975
... More
Laying of NP-3 Hume pipes
6
425
2550
... More
Cost of IInd Year Maintenaince @0.75%
1
44280
44280
... More
Cost of IIIrd Year Maintenaince @1.5%
1
88560
88560
... More
Cost of IVth Year Maintenaince @2.25%
1
132840
132840
... More
Cost of Vth Year Maintenaince @3.00%
1
177130
177130
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%